Gallery

On map

Il Vento is a residential project by Kora Properties in Maritime City, Dubai, with handover 30.09.2029, construction 1.2% complete per the DLD registry.

Construction1.2%

Construction progress

1.15%
  • Handover30.09.2029
  • Status date12.05.2026
  • DLD project number4003

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 6
12 May 2026 1.15%
Il Vento, Maritime City construction progress — 12 May 2026, 1.15% complete, photo 1 of 4Il Vento, Maritime City construction progress — 12 May 2026, 1.15% complete, photo 2 of 4Il Vento, Maritime City construction progress — 12 May 2026, 1.15% complete, photo 3 of 4Il Vento, Maritime City construction progress — 12 May 2026, 1.15% complete, photo 4 of 4

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
17.07.20262 BR138.94 289 136
08.06.20261 BR82.22 656 830
08.06.20261 BR72.32 590 000
08.06.20261 BR83.82 618 030
08.06.20261 BR81.02 560 740
08.06.20262 BR121.84 480 000
08.06.20261 BR81.02 577 000
08.06.20261 BR86.12 795 000
05.06.20262 BR115.14 084 640
05.06.20261 BR78.82 439 000
05.06.20261 BR81.02 505 000
05.06.20261 BR86.12 668 540
04.06.20261 BR72.32 539 000
04.06.20261 BR72.32 450 000
04.06.20261 BR72.32 440 000

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

About the project

Il Vento is a 331-unit development by Kora Properties in Maritime City, Dubai. The project is active, with a recorded completion ratio of 1.15% at the inspection dated 12 May 2026. Its scheduled completion date is 30 September 2029.

Project profile and configuration

Il Vento is planned as a single high-rise project in Maritime City with a total recorded area of 38,633.46 square metres and 331 units. The registered building configuration is 3B+G+5P+40+R, comprising three basement levels, a ground level, five podium levels, 40 further levels and a roof level. This configuration places the project within Dubai Maritime City’s growing commercial and residential precinct, where completed and under-construction towers sit alongside maritime-sector facilities. Kora Properties is the developer associated with Il Vento.

Construction status and programme

Il Vento is classified as active. Construction started on 30 October 2025, and the completion ratio was recorded at 1.15% during the 12 May 2026 inspection. The scheduled completion date is 30 September 2029. The project’s programme therefore runs from its October 2025 start through to its September 2029 completion target. The development is identified under project number 4003, which is also its Dubai Land Department project number.

A Maritime City address

Il Vento is located in Maritime City, on a purpose-built peninsula between Port Rashid and Dubai Dry Docks. Maritime City is a maritime-focused commercial and industrial zone developed on reclaimed land. Its masterplan includes an operational Industrial Precinct and a Commercial Precinct that is being developed in phases. The Commercial Precinct includes residential space, retail, offices and a promenade within its intended mixed-use structure. Maritime City was designed around six sectors: marine services, marine management, product marketing, marine research and education, recreation, and ship design and manufacturing.

Access to central Dubai

From the centre of Maritime City, Downtown Dubai and The Dubai Mall are each 7.8 kilometres away by road. DIFC is 6.3 kilometres away, Business Bay is 9.0 kilometres away, and Dubai International Airport is 10.1 kilometres away. Mall of the Emirates is 17.8 kilometres away, while Palm Jumeirah and Dubai Marina are 21.4 kilometres and 24.2 kilometres away respectively. The nearest metro station to the centre of Maritime City is Green Line station G24, at a distance of 2,331 metres.

The wider district

Maritime City’s Industrial Precinct is complete and operational. It includes ship lifts, ship-repair plots, warehouses, workshops, retail and showrooms serving maritime activity. The Commercial Precinct continues to develop in phases, with residential and mixed-use projects joining the district’s established industrial operations. Other named developments in and around Maritime City include Coral Reef, Harbour Lights, Nautica One, Nautica Two, Oceanz, Riva Residence, The Pier Residence, LIV Maritime, Franck Muller Yachting and Hilton Residences Dubai Maritime City. DP World acquired Dubai Maritime City in 2017, followed by a revised masterplan published in July 2019.

FAQ

Who is the developer of Il Vento?
Il Vento is developed by Kora Properties.
Where is Il Vento located?
Il Vento is located in Maritime City, Dubai, on the peninsula between Port Rashid and Dubai Dry Docks.
What is the current completion status of Il Vento?
Il Vento is active, with a completion ratio of 1.15% recorded at the inspection dated 12 May 2026.
When is Il Vento scheduled for completion?
The scheduled completion date is 30 September 2029.
When did construction of Il Vento start?
The recorded construction start date is 30 October 2025.
How many units are planned at Il Vento?
Il Vento has 331 recorded units.
What is the building configuration of Il Vento?
The registered configuration is 3B+G+5P+40+R.
How far is Dubai International Airport from Maritime City?
Dubai International Airport is 10.1 kilometres from the centre of Maritime City by road.
What is the nearest metro station to Maritime City?
Green Line station G24 is the nearest metro station, 2,331 metres from the centre of Maritime City.
How can I buy an apartment in Il Vento?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request