by K X G Real Estate Development in Majan
Forum 2 is a residential project by K X G Real Estate Development in Majan, Dubai, with handover 15.12.2027.
Construction progress
- Handover15.12.2027
- Status date22.07.2025
- DLD project number3807
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Forum 2 is a one-building residential development by K X G Real Estate Development in Majan, within Wadi Al Safa 3 in DubaiLand. The building is configured as two basement levels, a ground floor, eight upper floors and a roof level. It is active, with construction recorded at 0.00% at the inspection dated 22 July 2025 and completion scheduled for 15 December 2027.
The project configuration
Forum 2 comprises one residential building with 77 units. Its registered configuration is 2B+G+8+R, comprising two basement levels, a ground floor, eight floors and a roof level. The project has a recorded total area of 6,714.38. Forum 2 is identified under project number 3807. The development is positioned in Majan, a mixed-use district within the wider DubaiLand area and administratively within Wadi Al Safa 3. The building format places all 77 units within a single project structure rather than across multiple buildings.
Majan and the wider setting
Majan is a mixed-use community in DubaiLand, located in Wadi Al Safa 3. Its original masterplan set out residential, commercial, retail and entertainment land uses, with residential representing roughly one third of the planned land allocation. The community was launched in November 2006 and its initial Phase 1 roads and basic services were completed in 2007. Majan has since developed through a phased pattern of individual plot projects. The district includes completed buildings as well as projects at different stages of development. Forum 2 forms part of this Majan setting, where residential buildings sit alongside commercial, retail and entertainment allocations.
Road access and nearby destinations
Road travel is the primary means of access from Majan. Global Village is 2.6 km from the community centroid. The recorded road distance to Mall of the Emirates is 12.1 km, while Downtown Dubai and Burj Khalifa are 12.5 km away and The Dubai Mall is 12.4 km away. Business Bay is 11.7 km away and DIFC is 13.8 km away. Dubai International Airport is 18.6 km away. Other recorded road distances include 17.8 km to Dubai Marina, 18.6 km to JBR Beach, 18.1 km to Palm Jumeirah, 22.3 km to Expo City Dubai and 26.8 km to Al Maktoum International Airport.
Construction status and scheduled completion
Forum 2 is recorded as active. The construction completion ratio is 0.00%, based on the inspection dated 22 July 2025. The recorded project start date is 15 November 2025. Completion is scheduled for 15 December 2027. These dates provide the current recorded development timetable for the project. Forum 2 has 77 total units and one building, with the building configuration recorded as two basement levels, a ground floor, eight floors and a roof level. The project’s active status and recorded completion date place it within the current development pipeline in Majan.
A single-building residential scheme
Forum 2 is planned as a one-building development rather than a multi-building complex. The project contains 77 units in total. Its 2B+G+8+R structure provides two basement levels below the ground floor, followed by eight floors and a roof level. The recorded project area is 6,714.38. The development is located in Majan, within Wadi Al Safa 3, where the wider community includes residential, commercial, retail and entertainment land allocations. Forum 2 is registered under project number 3807 and has a scheduled completion date of 15 December 2027.
The developer
Forum 2 is developed by K X G Real Estate Development. The developer is identified for the project as K X G Real Estate Development L.L.C. K X G Real Estate Development is responsible for the 77-unit residential building in Majan. The project is configured as one building with two basement levels, a ground floor, eight floors and a roof level. Its recorded development timetable sets a start date of 15 November 2025 and a completion date of 15 December 2027. The project is currently recorded as active.