by Harbour One Investment in Dubai Marina
Dubai Harbour Residences (Area 1) is a residential project by Harbour One Investment in Dubai Marina, Dubai, with handover 14.01.2028, construction 15.9% complete per the DLD registry.
Construction progress
- Handover14.01.2028
- Status date20.04.2026
- DLD project number3133
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Dubai Harbour Residences (Area 1) is a two-building residential and commercial development in Dubai Marina by Harbour One Investment. The project has 217 units and is active, with construction recorded at 15.86% completion on 20 April 2026. Its project completion date is 14 January 2028.
The project at a glance
Dubai Harbour Residences (Area 1) comprises two buildings within Dubai Marina. The development is planned as a residential and commercial building arrangement with two basement levels, a ground floor and eight floors. Its ground level includes retail space and public praying facilities. The project covers a total area of 45,903.66 square metres and contains 217 units. Construction started on 7 February 2025, and the project is listed as active. The recorded completion ratio was 15.86% at the inspection dated 20 April 2026.
Building form and uses
The development combines residential accommodation with commercial uses in a two-building scheme. The stated building configuration is 2B+G+8, representing two basement levels, a ground floor and eight floors. Retail is included at ground level, alongside public praying facilities. This mix places everyday commercial activity within the development while the wider Dubai Marina district provides a waterfront setting of apartment towers, hospitality venues and pedestrian routes. Dubai Marina is a high-density urban waterfront district built around an artificial marina extending for more than three kilometres.
Dubai Marina setting
Dubai Harbour Residences (Area 1) is located in Dubai Marina, a waterfront district in western Dubai that connects to the Arabian Gulf through a man-made canal. The marina promenade runs alongside much of the water and is used for walking, jogging and cycling. Ground-floor restaurants, cafés, retail and marine activity are concentrated along the waterfront and quay areas. The district is predominantly residential, with high-rise apartment buildings along the marina and on its inner streets. JBR Beach is 0.7 km from the central marina, while Palm Jumeirah is 3.8 km away.
Connections from the district
Dubai Marina is served by the Dubai Metro Red Line. Red Line station R36 is 723 metres from the central marina area and can be reached on foot. From the central point of Dubai Marina, Mall of the Emirates is 7.5 km away, Expo City Dubai is 13.2 km away and Business Bay is 17.3 km away. Downtown Dubai and Burj Khalifa are 18.9 km away, while The Dubai Mall is 19.3 km away. Dubai International Airport is 29.9 km away and Al Maktoum International Airport is 20.3 km away.
Project timeline and construction status
The project start date is 7 February 2025. Dubai Harbour Residences (Area 1) is active and had reached 15.86% completion at the latest inspection dated 20 April 2026. The stated project completion date is 14 January 2028. The development is registered under project number 3133. Its programme brings 217 units across two buildings to the Dubai Marina area, with residential and commercial components and ground-floor retail.
Harbour One Investment
Harbour One Investment is the developer of Dubai Harbour Residences (Area 1). The company is delivering a two-building project in Dubai Marina with 217 units across a total area of 45,903.66 square metres. The development’s stated format incorporates residential and commercial space, two basement levels, a ground floor and eight floors, with retail and public praying facilities at ground level. Construction commenced on 7 February 2025, and the scheduled project completion date is 14 January 2028.

