Gallery

On map

Crown Palace is a residential project by Amirah Living Developer in Dubai South Residential District, Dubai, with handover 30.09.2028.

Construction0%

Payment plan 20/40/40

20%40%40%
  • Down payment20%
  • During construction40%
  • On handover40%

Construction progress

0%
  • Handover30.09.2028
  • Status date28.07.2025
  • DLD project number3846

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 2
28 July 2025 0.00%
Crown Palace, Dubai South Residential District construction progress — 28 July 2025, 0.00% complete, photo 1 of 2Crown Palace, Dubai South Residential District construction progress — 28 July 2025, 0.00% complete, photo 2 of 2

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

About the project

Crown Palace is an active 104-unit development by Amirah Living Developer in Dubai South Residential District, in Madinat Al Mataar. The project consists of one building with a G+6+R configuration and a registered total area of 8,929.39. Construction started on 1 September 2025, and completion is scheduled for 30 September 2028.

Crown Palace at a glance

Crown Palace is planned as a single-building project in Dubai South Residential District. It has 104 units and a G+6+R building configuration. The registered total project area is 8,929.39. The project is located in Madinat Al Mataar, within the wider Dubai South area. Dubai South Residential District is the residential component of the Dubai South masterplan, a larger development positioned to serve Al Maktoum International Airport and adjacent economic, logistics and aviation precincts. The district is planned around residential blocks, open spaces and local infrastructure.

Building configuration and project scale

The project comprises one building and 104 units. Its registered description is G+6+R. Crown Palace has a project start date of 1 September 2025 and a scheduled completion date of 30 September 2028. The development’s total registered area is 8,929.39. Within Dubai South Residential District, Crown Palace forms part of a location that contains residential projects at different stages of development. The district includes completed and under-construction towers and mid-rise residential developments, alongside planned streets, building plots and landscape areas.

Dubai South Residential District

Dubai South Residential District sits within the wider Dubai South masterplan. It functions as a residential enclave connected with Dubai South’s broader economic, logistics and aviation areas. The district’s published layout provides for residential blocks, open spaces and local infrastructure. Its position near Al Maktoum International Airport places it within a part of Dubai associated with airport-related and logistics activity. Crown Palace is registered in Madinat Al Mataar, which is the area name associated with the project. The district is intended as a planned housing neighbourhood for workers, families and residents connected with the wider Dubai South area.

Transport and nearby places

The Red Line is the metro line identified for the wider Dubai South Residential District. The referenced station is R76, and it is classified as not walkable from the district. Road travel connects the district with Dubai Mall, Palm Jumeirah, Burj Al Arab and The Walk at JBR. Recorded driving times for the district are 38 minutes to Dubai Mall, 34 minutes to Palm Jumeirah, 35 minutes to Burj Al Arab and 37 minutes to The Walk at JBR. Recorded airport driving times are 38 minutes to Dubai International Airport and 19 minutes to Al Maktoum International Airport. The International School of Choueifat DIP is a nearby school option for the district.

Construction status and completion schedule

Crown Palace is active. Its completion ratio was 0.00 at the inspection dated 28 July 2025. Construction started on 1 September 2025. The scheduled completion date is 30 September 2028. The project has 104 units within one building. These project details place Crown Palace among the developments under construction in Dubai South Residential District. The completion schedule is set for the end of September 2028, while the construction progress figure reflects the inspection dated 28 July 2025.

Amirah Living Developer

Crown Palace is developed by Amirah Living Developer. The developer was founded in 2024. Amirah Living Developer is the name used for the developer of Crown Palace, which is registered as a 104-unit project in Dubai South Residential District. The project’s scheduled construction period runs from 1 September 2025 to 30 September 2028. Crown Palace is configured as one G+6+R building with a registered total area of 8,929.39.

FAQ

Who is the developer of Crown Palace?
Crown Palace is developed by Amirah Living Developer. The developer was founded in 2024.
Where is Crown Palace located?
Crown Palace is located in Dubai South Residential District, in Madinat Al Mataar. The district is part of the wider Dubai South masterplan.
How many units are there at Crown Palace?
Crown Palace has 104 units. The project comprises one building.
What is the building configuration of Crown Palace?
Crown Palace is registered with a G+6+R configuration. It is planned as one building.
When is Crown Palace scheduled for completion?
The scheduled completion date is 30 September 2028. Construction started on 1 September 2025.
What is the current construction status of Crown Palace?
Crown Palace is active. Its completion ratio was 0.00 at the inspection dated 28 July 2025.
What is near Crown Palace in Dubai South?
Dubai South Residential District is positioned near Al Maktoum International Airport and associated economic, logistics and aviation precincts. The International School of Choueifat DIP is a nearby school option.
Is there metro access near Crown Palace?
The Red Line is the metro line identified for the wider district. The referenced station, R76, is classified as not walkable from Dubai South Residential District.
How can I buy an apartment in Crown Palace?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request