Developer: Iman Developers · Motor City
15 Cascade is a residential project by Iman Developers in Motor City, Dubai, with prices from AED 866 838, handover Q3 2028, construction 5.5% complete per the DLD registry, 440 units, 423 DLD-registered sales since 2020.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 150 | 423–554 |
| 1 Bedroom | 203 | 780–1 228 |
| 2 Bedroom | 64 | 1 260–2 130 |
| 3 Bedroom | 6 | 2 477–3 992 |
| 4 Bedroom | 7 | 3 266–6 606 |
| Other units | 12 | 869–1 951 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 866 838 AED is 3 660 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 04.10.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Iman Developers · District: Motor City
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 14.09.2026 | 3 BR | 378.3 | 2 733 174 |
| 31.07.2026 | 1 BR | 82.9 | 869 710 |
| 28.07.2026 | Studio | 39.3 | 866 838 |
| 22.07.2026 | Studio | 39.3 | 866 838 |
| 17.07.2026 | 1 BR | 73.4 | 1 321 460 |
| 08.07.2026 | 1 BR | 78.4 | 1 628 512 |
| 07.07.2026 | 1 BR | 80.5 | 1 607 279 |
| 03.07.2026 | 1 BR | 78.4 | 1 603 809 |
| 01.07.2026 | 91.5 | 3 243 252 | |
| 01.07.2026 | 169.5 | 6 841 131 | |
| 25.05.2026 | 2 BR | 156.6 | 1 863 263 |
| 28.04.2026 | 1 BR | 72.5 | 1 534 401 |
| 21.04.2026 | 1 BR | 75.6 | 1 513 519 |
| 08.04.2026 | 1 BR | 118.6 | 1 652 452 |
| 06.04.2026 | 1 BR | 74.6 | 1 555 107 |
| 06.04.2026 | 1 BR | 79.9 | 1 628 597 |
| 02.04.2026 | 2 BR | 117.9 | 1 899 189 |
| 30.03.2026 | 92.8 | 3 871 272 | |
| 25.03.2026 | 1 BR | 82.9 | 1 277 576 |
| 25.03.2026 | Studio | 39.3 | 866 837 |
Dubai Land Department transaction registry, updated 2026-10-03. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +10% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 39 | 892 713 | 22 890 | 135 |
| 1 bedroom | 78 | 1 575 407 | 20 198 | 196 |
| 2 bedrooms | 133 | 2 209 583 | 16 613 | 63 |
| 3 bedrooms | 305 | 2 887 861 | 9 468 | 7 |
| 4 bedrooms | 335 | 4 500 525 | 13 434 | 7 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
DLD has recorded 423 sales in this building since 2020, 3 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

15 Cascade is an active residential and commercial development in Motor City by Iman Developers. The project comprises one building with 440 units and is scheduled for handover in Q3 2028. Construction progress is recorded at 5.50%.
15 Cascade is planned as a 2B+G+15-storey residential and commercial building in Al Hebiah First, within the Motor City area of Dubai. Its architecture takes inspiration from speed and cascading water, reflecting Motor City’s association with Dubai Autodrome. The project includes amenity decks, a rooftop amenities deck, retail space and a double-height main entrance lobby. A grand drive and a cascading water feature form part of the arrival experience. The retail component includes 15,000 sq ft of double-height retail space, alongside retail shops and an outdoor seating area. The development is designed as a single building with 440 units.
The residence selection at 15 Cascade includes apartments, duplex apartments and penthouses. The announced collection includes three-bedroom duplex apartments, four-bedroom duplex apartments, corner-unit apartments with plunge pools and penthouses. The broader range also includes studios and one- to three-bedroom apartments. Private balconies are included with the residences. Versace Ceramics is featured within the project. The available formats provide a choice between conventional apartment layouts, duplex residences arranged across two levels, corner homes with plunge pools, and penthouse accommodation. The project’s unit mix is positioned within one building rather than across multiple residential towers.
The amenity programme includes a 30-metre infinity pool and a 7,000 sq ft beach-edge pool. A sky garden adds an elevated outdoor setting, while the Zen yoga deck provides a dedicated space for yoga. Indoor fitness provision is centred on the SkyFit gym, complemented by a multisports zone. Wellness facilities include a sauna, steam room and cold therapy room. The amenity offering also includes a games zone, a multipurpose lounge and an indoor children’s play area. EV parking is included within the development. These facilities are arranged alongside the project’s amenity decks and rooftop amenities deck.
15 Cascade is located in Motor City, a mixed-use DubaiLand community centred on the Dubai Autodrome race circuit. The area includes residential clusters, a villa neighbourhood, a business park, retail, leisure facilities and hotel accommodation. Motor City is accessed via Emirates Road and Al Khail Road. First Avenue Mall is part of the community and includes retailers and casual dining, while the Dubai Autodrome and Kartdrome are local leisure destinations. GEMS Metropole School serves pupils from Foundation Stage to Year 13. The project’s architectural concept is inspired by Dubai Autodrome, linking the design direction of 15 Cascade to the defining feature of its neighbourhood.
The stated travel time to Bluewaters Island is 17 minutes. Palm Jumeirah and Mall of the Emirates are each listed at 20 minutes, while Expo City and Dubai Mall are each listed at 22 minutes. Dubai International Airport is listed at 27 minutes and Al Maktoum International Airport at 28 minutes. Palm Jebel Ali is listed at 36 minutes. These destinations place the development within Motor City while providing stated road travel references for shopping, waterfront districts, airports and Expo City. Motor City itself has public bus services, including the F29 route towards Mall of the Emirates.
The starting price for 15 Cascade is AED 866,838. The payment plan is structured at 60/40, beginning with a 20% down payment on booking. A further 40% is payable during construction through the first to fourth instalments, with the final 40% due on handover at 100% completion. Handover is scheduled for Q3 2028, with the project end date recorded as 30 September 2028. The development began on 30 March 2025. Its current status is active, and construction completion is recorded at 5.50%.
15 Cascade is developed by Iman Developers, a Dubai developer founded in 2016. The company’s completed and announced project sequence includes Oxford Residences, Oxford Villas, Oxford Residences 2, Oxford Boulevard, Oxford 212, Oxford Terraces, Oxford Terraces 2, The Grove, Oxford Gardens, 10 Oxford, Gardens 2, One Park Central, One Sky Park and One Park Square. At 15 Cascade, Iman Developers is delivering a project that combines residential accommodation, retail space, landscaped and water-led design elements, and dedicated amenity areas. The development is planned for Motor City and has a Q3 2028 handover schedule.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 55 completed buildings in Motor City for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:15 Cascade — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-28, https://continentalclub.ae/project/15-cascade-motor-city/