Developer: Dar Global · Trade Centre First
Trump Tower is a residential project by Dar Global in Trade Centre First, Dubai, with prices from AED 2 772 000, handover Q4 2031, construction 3.8% complete per the DLD registry, 574 units, 382 DLD-registered sales since 2016.
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 252 | 708–1 095 |
| 2 Bedroom | 208 | 1 171–1 585 |
| 3 Bedroom | 110 | 1 642–2 183 |
| 4 Bedroom | 2 | 7 610–7 776 |
| Other units | 2 | 623–1 545 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 772 000 AED is 11 705 AED.
Estimates only; not a bank approval.
Data from the Dubai Land Department project registry (updated 13.11.2026 05:55).
Pace: 0.42% per month. At this rate we do not project a completion date: it falls more than 10 years out.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
52 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Dar Global · District: Trade Centre First
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 26.10.2026 | 2 BR | 116.0 | 4 508 148 |
| 24.09.2026 | 3 BR | 154.6 | 6 483 342 |
| 17.09.2026 | 1 BR | 82.0 | 3 476 126 |
| 07.09.2026 | 3 BR | 154.6 | 6 800 651 |
| 07.09.2026 | 1 BR | 82.0 | 3 471 528 |
| 31.08.2026 | 2 BR | 56.0 | 2 328 456 |
| 26.08.2026 | 2 BR | 109.2 | 4 018 457 |
| 20.07.2026 | 3 BR | 154.6 | 6 516 116 |
| 02.07.2026 | 1 BR | 70.9 | 2 973 276 |
| 29.06.2026 | 1 BR | 73.5 | 2 763 640 |
| 29.06.2026 | 1 BR | 81.6 | 3 829 291 |
| 22.05.2026 | 1 BR | 82.0 | 3 568 057 |
| 12.05.2026 | 1 BR | 81.6 | 3 293 000 |
| 09.04.2026 | 3 BR | 152.6 | 8 723 711 |
| 30.03.2026 | 1 BR | 73.5 | 3 061 484 |
| 23.02.2026 | 2 BR | 116.3 | 4 399 845 |
| 17.02.2026 | 1 BR | 75.2 | 2 985 800 |
| 17.02.2026 | 1 BR | 82.0 | 3 553 992 |
| 17.02.2026 | 2 BR | 111.9 | 5 721 660 |
| 11.02.2026 | 1 BR | 81.6 | 3 897 101 |
| 10.02.2026 | 1 BR | 75.2 | 2 883 334 |
| 26.01.2026 | 1 BR | 75.2 | 2 921 742 |
| 21.01.2026 | 3 BR | 154.6 | 6 318 333 |
| 15.01.2026 | 2 BR | 115.7 | 3 878 698 |
| 13.01.2026 | 1 BR | 81.6 | 3 768 508 |
| 12.01.2026 | 1 BR | 75.2 | 2 808 821 |
| 31.12.2025 | 1 BR | 70.9 | 2 995 301 |
| 25.12.2025 | 2 BR | 121.7 | 4 100 196 |
| 25.12.2025 | 1 BR | 82.0 | 3 511 564 |
| 12.12.2025 | 1 BR | 73.5 | 2 775 997 |
| 26.11.2025 | 3 BR | 202.9 | 11 244 368 |
| 26.11.2025 | 1 BR | 81.6 | 3 817 594 |
| 21.11.2025 | 1 BR | 75.2 | 2 860 234 |
| 10.11.2025 | 3 BR | 201.6 | 10 373 009 |
| 10.11.2025 | 1 BR | 81.6 | 3 952 945 |
| 10.11.2025 | 2 BR | 116.0 | 4 906 437 |
| 06.11.2025 | 2 BR | 111.9 | 5 264 094 |
| 31.10.2025 | 1 BR | 72.7 | 2 744 749 |
| 31.10.2025 | 1 BR | 72.7 | 2 735 758 |
| 30.10.2025 | 1 BR | 73.5 | 2 772 733 |
| 28.10.2025 | 2 BR | 111.9 | 4 486 165 |
| 28.10.2025 | 2 BR | 116.0 | 4 546 705 |
| 28.10.2025 | 2 BR | 111.9 | 5 226 034 |
| 28.10.2025 | 1 BR | 73.5 | 2 887 330 |
| 28.10.2025 | 3 BR | 201.6 | 10 602 775 |
| 24.10.2025 | 3 BR | 202.9 | 11 565 926 |
| 23.10.2025 | 3 BR | 154.6 | 6 384 235 |
| 23.10.2025 | 2 BR | 115.4 | 3 864 438 |
| 22.10.2025 | 3 BR | 152.6 | 6 859 024 |
| 22.10.2025 | 1 BR | 73.5 | 2 796 579 |
Dubai Land Department transaction registry, updated 12.11.2026. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 74 | 2 945 913 | 39 810 | 127 |
| 2 bedrooms | 116 | 4 133 228 | 35 631 | 176 |
| 3 bedrooms | 155 | 6 800 651 | 43 875 | 78 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
Based on 50 registered DLD sales in Trump Tower between 22 Oct 2025 and 26 Oct 2026: median 41 788 AED/m² (3 882 AED/sq ft); half of the deals fell between 38 127 and 45 875 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 3 084 000 | 26 | 41 010 | 75.2 |
| 2 BR | AED 4 523 000 | 13 | 39 196 | 115.4 |
| 3 BR | AED 6 950 000 | 11 | 44 954 | 154.6 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai new projects AED 2–5 million
30 projects · prices from DLD and developers
Sands Phase 2 by Ellington Deira Central · 1–4 BR
from AED 2,600,000
The Cape Majan · 1–4 BR
from AED 3,550,000
South Bay 2 South Bay 2
from AED 3,675,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
DLD has recorded 382 sales in this building since 2016, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Trump Tower is a single G+79 branded residential tower on Sheikh Zayed Road in Trade Centre First. It is being developed by Dar Global Luxury Property Development L.L.C S.O.C and is planned to contain 574 units. The project is active, with a recorded completion ratio of 2.03% and a completion date of 31 December 2031.
Trump Tower is planned as one residential building with a ground level and 79 upper floors. The tower is located on Sheikh Zayed Road within Trade Centre First, a central Dubai neighbourhood characterised by residential and hotel towers. Its residential component is described as branded apartments. The project has a recorded total area of 64,308.41 and a planned total of 574 units. Construction is scheduled to start on 15 January 2026, with the project completion date set for 31 December 2031. The project is active, and its recorded completion ratio was 2.03% following the inspection dated 27 April 2026.
The development is planned to provide 574 residential units within its single G+79 tower. The residences are described as branded residential apartments, placing the homes within a high-rise scheme on Sheikh Zayed Road. Trump Tower has one building and a recorded total area of 64,308.41. Trade Centre First is a built-up district where residential and hotel towers form a dense vertical skyline. This setting places Trump Tower among an established concentration of towers, hotel activity and retail provision in central Dubai. The project’s planned end date is 31 December 2031.
Trump Tower is planned with a pool, gymnasium and spa. Food and beverage facilities are also included within the project description, alongside other amenities. The amenity programme accompanies the branded residential apartments in the G+79 tower. These facilities are planned as part of a project that also includes a separate multi-storey parking structure. In Trade Centre First, pools and sports facilities are common on the rooftops of parking buildings serving nearby towers and hotels. The district’s built form combines tower development with parking structures positioned separately from the principal buildings.
The project includes a rear multi-storey parking building on a different plot from the tower. This arrangement reflects a defining pattern in Trade Centre First, where many tower developments rely on separate external multi-storey car parks located behind the main structures. Parking buildings in the neighbourhood frequently provide rooftop space used for resident and guest amenities, including swimming pools and sports facilities. The separation of parking from tower footprints is a recurring feature of the district’s layout. Trump Tower is planned on Sheikh Zayed Road with its parking component set behind the residential tower on a separate plot.
Trade Centre First is a compact central Dubai neighbourhood formed by residential and hotel towers, with external parking structures behind many tower clusters. The area combines dense vertical development with hotel, residential and retail activity. The Dubai Metro Red Line serves the district, and station R23 is 337 metres from typical points in Trade Centre First. Local educational and child development services include Widad Center for Child Development, 1.2 km away, and Citizens School, 1.9 km away. New retail outlets are planned in the area for 2025 and 2026, adding to the district’s shopping and service provision.
Trade Centre First is served by the Dubai Metro Red Line through station R23. Dubai Mall is listed as a 9-minute drive from the district, while Palm Jumeirah is listed at 20 minutes by car. Burj Al Arab is listed at 19 minutes by car and The Walk at JBR at 24 minutes by car. Dubai International Airport is listed as a 14-minute drive from Trade Centre First. Al Maktoum International Airport is listed at 44 minutes by car. These travel times relate to the Trade Centre First district where Trump Tower is located.
Dar Global Luxury Property Development L.L.C S.O.C is developing Trump Tower. The project has a start date of 15 January 2026 and a completion date of 31 December 2031. Its project number is 3691. The development is active and recorded a 2.03% completion ratio on the inspection dated 27 April 2026. Trump Tower is planned as one G+79 building with 574 units, branded residential apartments, a pool, gymnasium, spa, food and beverage facilities, and rear multi-storey parking on a separate plot. It is located in Trade Centre First on Sheikh Zayed Road.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Trump Tower — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-27, https://continentalclub.ae/project/trump-tower-trade-centre-first/