Developer: Dar Global · Trade Centre First

Trump Tower

Trump Tower is a residential project by Dar Global in Trade Centre First, Dubai, with prices from AED 2 772 000, handover Q4 2031, construction 3.8% complete per the DLD registry, 574 units, 382 DLD-registered sales since 2016.

Price fromAED 2 772 000Our calculation
Unit types1–4 BR708–7 776 ft²DLD registry
HandoverQ4 2031Developer supplied
Construction3.8%DLD registry · checked 10.09.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom252708–1 095
2 Bedroom2081 171–1 585
3 Bedroom1101 642–2 183
4 Bedroom27 610–7 776
Other units2623–1 545

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 772 000 AED is 11 705 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

3.8%
  • Construction started15.01.2026
  • HandoverQ4 2031
  • Status date10.09.2026
  • Progress between DLD inspections+1.77% (27.04.2026 → 10.09.2026)
  • Escrow bankEmirates NBD
  • DLD project number3691

Data from the Dubai Land Department project registry (updated 13.11.2026 05:55).

Inspection history 5
025507510016.04.202510.09.2026
Actual, per inspections

Pace: 0.42% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 88
10.09.2026 3.80%
Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 1 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 2 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 3 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 4 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 5 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 6 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 7 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 8 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 9 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 10 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 11 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 12 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 13 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 14 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 15 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 16 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 17 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 18 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 19 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 20 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 21 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 22 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 23 of 24Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 24 of 24
10.09.2026 3.80%
Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 1 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 2 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 3 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 4 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 5 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 6 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 7 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 8 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 9 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 10 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 11 of 12Trump Tower, Trade Centre First construction progress — 10 September 2026, 3.80% complete, photo 12 of 12

52 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
26.10.20262 BR116.04 508 148
24.09.20263 BR154.66 483 342
17.09.20261 BR82.03 476 126
07.09.20263 BR154.66 800 651
07.09.20261 BR82.03 471 528
31.08.20262 BR56.02 328 456
26.08.20262 BR109.24 018 457
20.07.20263 BR154.66 516 116
02.07.20261 BR70.92 973 276
29.06.20261 BR73.52 763 640
29.06.20261 BR81.63 829 291
22.05.20261 BR82.03 568 057
12.05.20261 BR81.63 293 000
09.04.20263 BR152.68 723 711
30.03.20261 BR73.53 061 484
23.02.20262 BR116.34 399 845
17.02.20261 BR75.22 985 800
17.02.20261 BR82.03 553 992
17.02.20262 BR111.95 721 660
11.02.20261 BR81.63 897 101
10.02.20261 BR75.22 883 334
26.01.20261 BR75.22 921 742
21.01.20263 BR154.66 318 333
15.01.20262 BR115.73 878 698
13.01.20261 BR81.63 768 508
12.01.20261 BR75.22 808 821
31.12.20251 BR70.92 995 301
25.12.20252 BR121.74 100 196
25.12.20251 BR82.03 511 564
12.12.20251 BR73.52 775 997
26.11.20253 BR202.911 244 368
26.11.20251 BR81.63 817 594
21.11.20251 BR75.22 860 234
10.11.20253 BR201.610 373 009
10.11.20251 BR81.63 952 945
10.11.20252 BR116.04 906 437
06.11.20252 BR111.95 264 094
31.10.20251 BR72.72 744 749
31.10.20251 BR72.72 735 758
30.10.20251 BR73.52 772 733
28.10.20252 BR111.94 486 165
28.10.20252 BR116.04 546 705
28.10.20252 BR111.95 226 034
28.10.20251 BR73.52 887 330
28.10.20253 BR201.610 602 775
24.10.20253 BR202.911 565 926
23.10.20253 BR154.66 384 235
23.10.20252 BR115.43 864 438
22.10.20253 BR152.66 859 024
22.10.20251 BR73.52 796 579

Dubai Land Department transaction registry, updated 12.11.2026. Explore Dubai property transactions →

Registered transactions in Trump Tower

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

382deals since 2016
39 463AED per m², median
0%resale, the rest bought from the developer
+7%over the past year

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom742 945 91339 810127
2 bedrooms1164 133 22835 631176
3 bedrooms1556 800 65143 87578

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Trump Tower between 22 Oct 2025 and 26 Oct 2026: median 41 788 AED/m² (3 882 AED/sq ft); half of the deals fell between 38 127 and 45 875 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 3 084 0002641 01075.2
2 BRAED 4 523 0001339 196115.4
3 BRAED 6 950 0001144 954154.6
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Dubai new projects AED 2–5 million

30 projects · prices from DLD and developers

  1. Sands Phase 2 by Ellington Sands Phase 2 by Ellington Deira Central · 1–4 BR from AED 2,600,000
  2. The Cape The Cape Majan · 1–4 BR from AED 3,550,000
  3. South Bay 2 South Bay 2 South Bay 2 from AED 3,675,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Trump Tower worth?

DLD has recorded 382 sales in this building since 2016, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

About the project

Trump Tower is a single G+79 branded residential tower on Sheikh Zayed Road in Trade Centre First. It is being developed by Dar Global Luxury Property Development L.L.C S.O.C and is planned to contain 574 units. The project is active, with a recorded completion ratio of 2.03% and a completion date of 31 December 2031.

The tower

Trump Tower is planned as one residential building with a ground level and 79 upper floors. The tower is located on Sheikh Zayed Road within Trade Centre First, a central Dubai neighbourhood characterised by residential and hotel towers. Its residential component is described as branded apartments. The project has a recorded total area of 64,308.41 and a planned total of 574 units. Construction is scheduled to start on 15 January 2026, with the project completion date set for 31 December 2031. The project is active, and its recorded completion ratio was 2.03% following the inspection dated 27 April 2026.

Residences and project scale

The development is planned to provide 574 residential units within its single G+79 tower. The residences are described as branded residential apartments, placing the homes within a high-rise scheme on Sheikh Zayed Road. Trump Tower has one building and a recorded total area of 64,308.41. Trade Centre First is a built-up district where residential and hotel towers form a dense vertical skyline. This setting places Trump Tower among an established concentration of towers, hotel activity and retail provision in central Dubai. The project’s planned end date is 31 December 2031.

Amenities within the project

Trump Tower is planned with a pool, gymnasium and spa. Food and beverage facilities are also included within the project description, alongside other amenities. The amenity programme accompanies the branded residential apartments in the G+79 tower. These facilities are planned as part of a project that also includes a separate multi-storey parking structure. In Trade Centre First, pools and sports facilities are common on the rooftops of parking buildings serving nearby towers and hotels. The district’s built form combines tower development with parking structures positioned separately from the principal buildings.

Parking arrangement

The project includes a rear multi-storey parking building on a different plot from the tower. This arrangement reflects a defining pattern in Trade Centre First, where many tower developments rely on separate external multi-storey car parks located behind the main structures. Parking buildings in the neighbourhood frequently provide rooftop space used for resident and guest amenities, including swimming pools and sports facilities. The separation of parking from tower footprints is a recurring feature of the district’s layout. Trump Tower is planned on Sheikh Zayed Road with its parking component set behind the residential tower on a separate plot.

Trade Centre First setting

Trade Centre First is a compact central Dubai neighbourhood formed by residential and hotel towers, with external parking structures behind many tower clusters. The area combines dense vertical development with hotel, residential and retail activity. The Dubai Metro Red Line serves the district, and station R23 is 337 metres from typical points in Trade Centre First. Local educational and child development services include Widad Center for Child Development, 1.2 km away, and Citizens School, 1.9 km away. New retail outlets are planned in the area for 2025 and 2026, adding to the district’s shopping and service provision.

Connections from the district

Trade Centre First is served by the Dubai Metro Red Line through station R23. Dubai Mall is listed as a 9-minute drive from the district, while Palm Jumeirah is listed at 20 minutes by car. Burj Al Arab is listed at 19 minutes by car and The Walk at JBR at 24 minutes by car. Dubai International Airport is listed as a 14-minute drive from Trade Centre First. Al Maktoum International Airport is listed at 44 minutes by car. These travel times relate to the Trade Centre First district where Trump Tower is located.

Development programme and developer

Dar Global Luxury Property Development L.L.C S.O.C is developing Trump Tower. The project has a start date of 15 January 2026 and a completion date of 31 December 2031. Its project number is 3691. The development is active and recorded a 2.03% completion ratio on the inspection dated 27 April 2026. Trump Tower is planned as one G+79 building with 574 units, branded residential apartments, a pool, gymnasium, spa, food and beverage facilities, and rear multi-storey parking on a separate plot. It is located in Trade Centre First on Sheikh Zayed Road.

Frequent questions

Who is the developer of Trump Tower?
Trump Tower is being developed by Dar Global Luxury Property Development L.L.C S.O.C.
Where is Trump Tower located?
Trump Tower is located on Sheikh Zayed Road in Trade Centre First, Dubai.
What type of project is Trump Tower?
It is a single G+79 branded residential tower planned with 574 units.
What amenities are planned at Trump Tower?
The project includes a pool, gymnasium, spa and food and beverage facilities.
What is the completion status of Trump Tower?
The project is active, with a recorded completion ratio of 2.03% following the 27 April 2026 inspection.
When is Trump Tower scheduled for completion?
The project completion date is 31 December 2031. Its scheduled start date is 15 January 2026.
Does Trump Tower have separate parking?
Yes. A rear multi-storey parking building is planned on a different plot from the tower.
What is near Trump Tower in Trade Centre First?
The district is served by Dubai Metro Red Line station R23, located 337 metres from typical points in Trade Centre First. Dubai Mall is listed as a 9-minute drive from the district.
How can I buy an apartment in Trump Tower?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

More projects by Dar Global

All 5 projects by Dar Global →

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Trump Tower — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-27, https://continentalclub.ae/project/trump-tower-trade-centre-first/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.