The Wind Tower I is a residential project by H A B N Real Estate Development in Jumeirah Lakes Towers, Dubai, with handover 05.06.2023, construction 74.6% complete per the DLD registry.

Construction74.6%

Construction progress

74.58%
  • Handover05.06.2023
  • Status date10.08.2023
  • DLD project number398

Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).

About the project

The Wind Tower I is a freehold mixed-use residential and commercial tower in Jumeirah Lakes Towers. H A B N Real Estate Development is developing the project. It is active, with a recorded completion ratio of 74.58%.

The project configuration

The Wind Tower I is planned as a single tower containing residential and commercial space in Jumeirah Lakes Towers. Its designed configuration is five basement levels, a ground floor and 30 floors above ground, described as 5B+G+30. The building is designed with a concrete structure and external and internal finishes. The project has a recorded total area of 32,715.51 and 515 total units. The freehold tenure and mixed-use format place homes and commercial premises within the same tower development.

Construction status and project dates

The Wind Tower I is recorded as active. Its completion ratio is 74.58%, based on an inspection dated 10 August 2023. The project start date is 1 June 2003, and its recorded completion date is 5 June 2023. These dates provide the formal project timeline alongside the current active status. The project is identified by project number 398 and consists of one building.

Jumeirah Lakes Towers setting

The tower is located in Jumeirah Lakes Towers, a mixed-use waterfront district immediately behind Dubai Marina. JLT combines residential towers, commercial premises, hotels, retail and landscaped public spaces around three artificial lakes and a central park. The district contains 87 tower blocks across 23 clusters, with high-rise buildings forming its predominant urban setting. The Dubai Multi Commodities Centre free zone is based in JLT and hosts more than 21,000 companies. Lakeside promenades and the central park provide walking, jogging and cycling routes, while residential, office and retail uses operate across the district.

Transport and nearby destinations

Jumeirah Lakes Towers is served by the Dubai Metro Red Line. Station R36 is 685 metres away and can be reached on foot from within the district. Pedestrian promenades and local roads connect JLT with Dubai Marina and surrounding areas. Road-distance figures from JLT include 1.4 km to Dubai Marina, 2.1 km to JBR Beach, 3.9 km to Palm Jumeirah and 6.3 km to Mall of the Emirates. Downtown Dubai is 17.7 km away, The Dubai Mall is 18.1 km away, Dubai International Airport is 28.7 km away and Al Maktoum International Airport is 20.5 km away.

District amenities and public realm

JLT’s principal outdoor spaces are its three lakes, central park and lakeside promenades. These areas support pedestrian movement as well as retail and dining activity throughout the neighbourhood. The district is also receiving phased public-realm and infrastructure upgrades, including lake and lake-wall improvements, water-quality works, landscape enhancements and road connections with Jumeirah Islands. Visitor parking is being expanded as part of these works. Recreational-facility and sports-infrastructure upgrades have also been announced for residents, workers and visitors. The area’s high-rise residential and commercial mix reflects its role as both a residential district and a business location.

FAQ

Who is the developer of The Wind Tower I?
The Wind Tower I is being developed by H A B N Real Estate Development.
Where is The Wind Tower I located?
The project is in Jumeirah Lakes Towers, Dubai, immediately behind Dubai Marina.
What type of project is The Wind Tower I?
It is a freehold mixed-use residential and commercial tower development.
How many floors does The Wind Tower I have?
The tower is designed as 5B+G+30: five basement levels, a ground floor and 30 floors.
How many units are recorded for The Wind Tower I?
The project has 515 total units recorded.
What is the current completion status of The Wind Tower I?
The project is active, with a recorded completion ratio of 74.58%.
What is the recorded completion date for The Wind Tower I?
The recorded completion date is 5 June 2023.
What transport is available in Jumeirah Lakes Towers?
JLT is served by the Dubai Metro Red Line. Station R36 is 685 metres away and can be reached on foot from within the district.
How can I buy an apartment in The Wind Tower I?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.