by RIJAS ACES in Majan
Rijas Suites is a residential project by RIJAS ACES in Majan, Dubai, with handover 31.12.2028, construction 3.3% complete per the DLD registry.
Construction progress
- Handover31.12.2028
- Status date29.06.2026
- DLD project number3433
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.07.2026 | Studio | 29.6 | 621 697 |
| 15.06.2026 | Studio | 23.2 | 616 528 |
| 20.05.2026 | 1 BR | 46.7 | 863 905 |
| 20.05.2026 | 2 BR | 65.7 | 1 130 836 |
| 04.05.2026 | 1 BR | 46.7 | 880 930 |
| 15.04.2026 | 1 BR | 37.4 | 725 208 |
| 15.04.2026 | 1 BR | 47.7 | 847 277 |
| 15.04.2026 | Studio | 24.3 | 511 880 |
| 06.04.2026 | Studio | 24.3 | 509 096 |
| 06.04.2026 | 2 BR | 65.4 | 1 131 312 |
| 25.03.2026 | Studio | 29.3 | 612 257 |
| 25.03.2026 | 2 BR | 65.7 | 1 140 433 |
| 17.03.2026 | 2 BR | 65.4 | 1 112 191 |
| 18.02.2026 | Studio | 26.9 | 655 795 |
| 02.02.2026 | 1 BR | 37.4 | 760 476 |
| 16.01.2026 | Studio | 30.4 | 602 248 |
| 16.01.2026 | Studio | 23.4 | 528 080 |
| 15.01.2026 | 1 BR | 41.5 | 773 736 |
| 14.01.2026 | Studio | 29.4 | 588 229 |
| 14.01.2026 | 1 BR | 37.4 | 733 266 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
About the project
Rijas Suites is a 153-unit residential project by Dusit Rijas Properties in Majan, within Wadi Al Safa 3. The development comprises one building in a 3B+G+8+R configuration. It is active, with a reported completion ratio of 3.33% and a completion date of 31 December 2028.
The project
Rijas Suites is planned as a single building containing 153 units. Its registered building configuration is 3B+G+8+R, identifying three basement levels, a ground level, eight upper floors and a roof level. The project has a total area of 6,427.52. Construction started on 26 November 2024, and the project is currently active. The reported completion ratio is 3.33%, based on an inspection dated 29 June 2026. The completion date is set for 31 December 2028. For buyers considering a project in its early construction phase, these details establish the project’s scale, current delivery stage and scheduled completion date.
Majan and the wider setting
Rijas Suites is located in Majan, a mixed-use community in DubaiLand within Wadi Al Safa 3. Majan was launched in November 2006 and covers 16.5 million square feet. Its original plan divided land among residential, commercial and retail and entertainment uses, with a skyline concept of 150 towers. The masterplan has since been adapted to accommodate smaller plot developments and a more incremental pattern of construction. Majan includes residential, commercial, retail and entertainment plots, placing Rijas Suites within a district that combines several land uses. The community sits within the wider DubaiLand precinct and is visible from surrounding arterial roads.
Nearby parks and leisure destinations
Majan Active Park is 0.4 km from Rijas Suites, while Majan Central Park is 0.6 km away. The Bay Al Barari is at a distance of 0.7 km. IMG Worlds of Adventure is 1.7 km from the project, and Novo Cinema at IMG Worlds of Adventure is also 1.7 km away. Global Village is 3.2 km away. Dubai Hills Golf Club is 5.8 km from Rijas Suites, followed by Arabian Ranches Golf Club at 6.9 km and The Track Meydan at 7.3 km. The Storm Coaster is also 7.3 km away. These destinations place parks, entertainment venues and golf clubs among the nearby points of interest.
Road access and city destinations
Road travel is the primary mode of access for Majan. The nearest recorded Dubai Metro Red Line station is R29, at a distance of 11,422 metres. Global Village is 2.6 km from the Majan community centroid. Mall of the Emirates is 12.1 km away, The Dubai Mall is 12.4 km away and Burj Khalifa and Downtown Dubai are 12.5 km away. Business Bay is 11.7 km from Majan, while Dubai International Financial Centre is 13.8 km away. Dubai International Airport is 18.6 km away, and Al Maktoum International Airport is 26.8 km away. Dubai Marina is 17.8 km away, Palm Jumeirah is 18.1 km away and JBR Beach is 18.6 km away.
Construction status and completion
Rijas Suites is classified as active. The current completion ratio is 3.33%, following an inspection dated 29 June 2026. Construction began on 26 November 2024, and the project’s completion date is 31 December 2028. The project is identified under project number 3433. The development contains one building and 153 units, with a total area of 6,427.52. These project details provide a defined timeline from construction commencement through to the scheduled completion date, together with a current progress figure for buyers assessing its delivery stage.
The developer
Dusit Rijas Properties is the developer of Rijas Suites. The company is named for this 153-unit project in Majan, which is arranged as one building. Rijas Suites began construction on 26 November 2024 and has a completion date of 31 December 2028. The project sits in Majan, within the Wadi Al Safa 3 area of DubaiLand. Majan’s development pattern includes completed buildings alongside projects under construction, modification and planning, reflecting the district’s phased growth. Rijas Suites forms part of this mixed-use community, where residential, commercial, retail and entertainment plots are included in the local masterplan.

