Developer: Emirates Mezna For Real Estate Development L L C – Dubai · Jumeirah Lakes Towers

Hilton Residences Dubai Jumeirah Lakes Towers

Hilton Residences Dubai Jumeirah Lakes Towers is a residential project by Emirates Mezna For Real Estate Development L L C – Dubai in Jumeirah Lakes Towers, Dubai, with prices from AED 1 166 000, construction 63% complete per the DLD registry, 401 units, 74 DLD-registered sales since 2019.

Price fromAED 1 166 000Our calculation
Unit typesStudio · 1–4 BR373–4 432 ft²DLD registry
Construction63%DLD registry · checked 09.10.2025

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio130373–421
1 Bedroom122723–1 118
2 Bedroom136999–1 408
3 Bedroom61 420–2 471
4 Bedroom44 431–4 432
Other units31 848–3 866

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: 4% of residential units. Typical size: 2 Bedroom — ~342 sq.ft (32 m²); 3 Bedroom — ~958 sq.ft (89 m²); 4 Bedroom — ~1084 sq.ft (101 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

62.97%
  • Construction started01.09.2023
  • Status date09.10.2025
  • Progress between DLD inspections+2.4% (09.11.2023 → 09.10.2025)
  • Escrow bankEmirates NBD
  • DLD project number2806

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

Inspection history 2
025507510009.11.202309.10.2025
Actual, per inspections

Pace: 0.10% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 90
09.10.2025 62.97%
Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 1 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 2 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 3 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 4 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 5 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 6 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 7 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 8 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 9 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 10 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 11 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 12 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 13 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 14 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 15 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 16 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 17 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 18 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 19 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 20 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 21 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 22 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 23 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 24 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 25 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 26 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 27 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 28 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 29 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 30 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 31 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 32 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 33 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 34 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 35 of 36Hilton Residences Dubai Jumeirah Lakes Towers, Jumeirah Lakes Towers construction progress — 9 October 2025, 62.97% complete, photo 36 of 36

54 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Hilton Residences Dubai Jumeirah Lakes Towers

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

74deals since 2019
35 144AED per m², median
1%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio361 255 76634 88250
1 bedroom682 629 10938 66312
2 bedrooms933 332 75635 83611

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
06.11.20261 BR67.82 592 292
21.10.20261 BR67.42 629 109
21.10.20261 BR67.12 600 515
21.10.20261 BR67.92 629 965
20.10.20261 BR67.92 629 965
20.10.20261 BR68.72 660 190
20.10.20261 BR70.12 678 268
20.10.20261 BR67.92 593 438
21.09.2026Studio36.21 170 580
27.08.20261 BR67.92 549 605
27.08.20261 BR67.42 585 593
27.08.2026Studio34.71 278 157
27.08.2026Studio39.11 283 386
25.08.2026Studio34.91 265 546
23.07.20261 BR67.42 629 109
30.06.2026Studio34.71 157 804
30.06.2026Studio39.11 283 387
30.06.2026Studio34.91 166 822
30.06.2026Studio36.31 277 138
30.06.2026Studio36.31 293 363
10.06.2026Studio36.21 272 921
07.05.2026Studio34.91 166 822
24.04.2026Studio36.21 170 581
22.04.2026Studio39.11 262 364
22.04.2026Studio34.71 157 804
22.04.20262 BR92.82 948 902
22.04.20262 BR141.85 134 621
22.04.2026Studio36.31 174 458
21.04.2026Studio36.31 174 459
10.04.20262 BR93.02 996 586
10.04.2026Studio34.91 166 821
10.04.20262 BR93.03 392 804
09.04.2026Studio34.91 288 111
09.04.20262 BR93.03 392 804
09.04.2026Studio34.71 278 156
09.04.2026Studio39.11 372 729
08.04.2026Studio34.71 255 766
08.04.2026Studio36.21 272 921
08.04.2026Studio39.11 372 730
08.04.2026Studio36.31 277 138
08.04.2026Studio36.21 272 920
08.04.2026Studio34.91 166 822
08.04.2026Studio36.21 170 580
08.04.20261 BR67.92 629 965
08.04.20262 BR101.83 753 364
08.04.2026Studio34.91 265 545
08.04.2026Studio39.11 283 387
08.04.2026Studio36.31 174 459
08.04.2026Studio36.21 170 581
08.04.2026Studio34.91 166 821

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 166 000 AED is 4 924 AED.

Calculate mortgage

Estimates only; not a bank approval.

Your broker for this project

Tetiana Karpenko

Tetiana Karpenko

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Hilton Residences Dubai Jumeirah Lakes Towers: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Hilton Residences Dubai Jumeirah Lakes Towers is a 401-unit residential project in Jumeirah Lakes Towers, on Cluster F01 Plot 393-0950. Emirates Mezna For Real Estate Development L L C – Dubai is the developer. The project is active, with construction completion recorded at 62.97% on 9 October 2025.

The project at a glance

Hilton Residences Dubai Jumeirah Lakes Towers is a single-building development with a recorded total area of 33,443.63. The building is described as a modification of an existing structure configured as 3B+P+G+35+R. The project contains 401 units and began on 1 September 2023. It is located within Jumeirah Lakes Towers, in Cluster F01 on Plot 393-0950, in the Al Thanyah Fifth area. Jumeirah Lakes Towers is a mixed-use waterfront district immediately behind Dubai Marina, combining residential towers, commercial premises, hotels, retail and landscaped public spaces.

Construction status

The project is active. Construction completion was recorded at 62.97% following an inspection dated 9 October 2025. The project start date is 1 September 2023. Hilton Residences Dubai Jumeirah Lakes Towers is planned as one building with 401 units. Its recorded configuration of 3B+P+G+35+R sets it within JLT’s established high-rise urban setting, where residential and commercial towers are grouped in clusters around the district’s lakes, promenades and central park.

Jumeirah Lakes Towers setting

Jumeirah Lakes Towers comprises 87 tower blocks across 23 clusters. The district is arranged around three artificial lakes and a central park, with lakeside promenades, walking routes, jogging routes and cycling routes. Its built environment combines apartments and serviced residences with office floors, retail, dining venues and hotels. The Dubai Multi Commodities Centre free zone is based in JLT and hosts more than 21,000 companies across a range of sectors. The district’s mix of residential, commercial and public spaces places Hilton Residences Dubai Jumeirah Lakes Towers within an established waterfront and business-focused part of western Dubai.

Connections from JLT

Jumeirah Lakes Towers is served by the Dubai Metro Red Line. Station R36 is 685 metres away on foot. Dubai Marina is 1.4 km from JLT, JBR Beach is 2.1 km away and Palm Jumeirah is 3.9 km away. Mall of the Emirates is 6.3 km away, while Expo City Dubai is 13.4 km from the district. Downtown Dubai is 17.7 km away, The Dubai Mall is 18.1 km away and DIFC is 19.5 km away. Dubai International Airport is 28.7 km from JLT, and Al Maktoum International Airport is 20.5 km away.

Public realm and district infrastructure

JLT is undergoing phased public-realm and infrastructure upgrades. These works include lake and lake-wall improvements, water-quality works, landscape enhancements, road connections with Jumeirah Islands and expanded visitor parking. An initial tree-replacement phase involved the removal and replanting of 60 palm trees. Further planting is planned as part of the wider programme. Recreational-facility upgrades and new sports infrastructure have also been announced for residents, workers and visitors. The district’s central park and lakeside promenades form its principal outdoor public spaces and link the clusters of residential, office and retail buildings.

Nearby development in JLT

BAY360 is planned for part of Lake D in JLT while retaining most of the lake. The mixed-use scheme is set to include retail, dining, wellness and recreational amenities, together with a 22,000 sq ft supermarket and an underground car park with 300 spaces. The plan also includes upgraded pedestrian routes and lakeside edges. Completion for BAY360 is expected towards the end of 2027. Elsewhere in the district, public-building works have included façade renovation and landscaping around the Jewellery and Gemplex, alongside lake and promenade enhancements.

The developer

Emirates Mezna For Real Estate Development L L C – Dubai is the developer of Hilton Residences Dubai Jumeirah Lakes Towers. The development is registered as a 401-unit, one-building project in Jumeirah Lakes Towers. The project started on 1 September 2023 and remains active. Its site is identified as Cluster F01, Plot 393-0950, within the Al Thanyah Fifth area. JLT’s wider master-planned environment includes the DMCC free zone, lakeside public spaces, a central park, commercial premises and high-rise residential buildings.

Frequent questions

Who is the developer of Hilton Residences Dubai Jumeirah Lakes Towers?
Emirates Mezna For Real Estate Development L L C - Dubai is the developer.
Where is Hilton Residences Dubai Jumeirah Lakes Towers located?
The project is in Jumeirah Lakes Towers, at Cluster F01, Plot 393-0950, in the Al Thanyah Fifth area.
How many units are in Hilton Residences Dubai Jumeirah Lakes Towers?
The development contains 401 units in one building.
What is the construction status of Hilton Residences Dubai Jumeirah Lakes Towers?
The project is active. Construction completion was recorded at 62.97% on 9 October 2025.
When did construction start at Hilton Residences Dubai Jumeirah Lakes Towers?
The recorded project start date is 1 September 2023.
What is the building configuration?
The registered building configuration is 3B+P+G+35+R.
How far is Dubai Marina from JLT?
Dubai Marina is 1.4 km from Jumeirah Lakes Towers. JBR Beach is 2.1 km away.
Is JLT connected to the Dubai Metro?
Jumeirah Lakes Towers is served by the Dubai Metro Red Line. Station R36 is 685 metres away on foot.
How can I buy an apartment in Hilton Residences Dubai Jumeirah Lakes Towers?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Hilton Residences Dubai Jumeirah Lakes Towers between 8 Apr 2026 and 6 Nov 2026: median 35 144 AED/m² (3 265 AED/sq ft); half of the deals fell between 32 991 and 36 866 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 1 209 0003233 39536.2
1 BRAED 2 631 0001238 75067.9
2 BRAED 3 381 000636 35593
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Jumeirah Lakes Towers: new projects and prices

17 projects · prices from DLD and developers

  1. Golf Views Seven City Golf Views Seven City Jumeirah Lakes Towers from AED 459,888
  2. Seven City Jlt Seven City Jlt Jumeirah Lakes Towers · Studio, 1–3 BR from AED 490,000
  3. Upper House Upper House Jumeirah Lakes Towers from AED 800,000

14 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Hilton Residences Dubai Jumeirah Lakes Towers worth?

DLD has recorded 74 sales in this building since 2019, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Emirates Mezna For Real Estate Development L L C – Dubai

All 2 projects by Emirates Mezna For Real Estate Development L L C – Dubai →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Hilton Residences Dubai Jumeirah Lakes Towers — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-09, https://continentalclub.ae/project/hilton-residences-dubai-jumeirah-lakes-towers-jumeirah-lakes-towers/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.