Developer: Aqasa Developers · Al Furjan

Enqlave By Aqasa

Enqlave By Aqasa is a residential project by Aqasa Developers in Al Furjan, Dubai, with prices from AED 582 000, construction 70.3% complete per the DLD registry, 159 units, 161 DLD-registered sales since 2023.

Price fromAED 582 000Our calculation
Unit typesStudio · 1–3 BR386–2 203 ft²DLD registry
Construction70.3%DLD registry · checked 22.09.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio44386–388
1 Bedroom72739–989
2 Bedroom411 079–1 486
3 Bedroom21 701–2 203

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~43 sq.ft (4.0 m²); 1 Bedroom — ~86 sq.ft (8.0 m²); 2 Bedroom — ~223 sq.ft (21 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Down payment

Payment plan 50/50 50% before handover · 50% on handover

The purchase price is split into these stages.

120%Down payment
230%During construction
350%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

70.29%
  • Construction started28.05.2024
  • Status date22.09.2026
  • Progress between DLD inspections+12.56% (11.06.2026 → 22.09.2026)
  • Escrow bankMashreq Bank
  • DLD project number2959

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

Inspection history 6
025507510029.03.202422.09.2026
Actual, per inspections

Pace: 3.97% per month. At this rate 100% falls on 07.05.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
22.09.2026 70.29%
Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 1 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 2 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 3 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 4 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 5 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 6 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 7 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 8 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 9 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 10 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 11 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 12 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 13 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 14 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 15 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 16 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 17 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 18 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 19 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 20 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 21 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 22 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 23 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 24 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 25 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 26 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 27 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 28 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 29 of 30Enqlave By Aqasa, Al Furjan construction progress — 22 September 2026, 70.29% complete, photo 30 of 30
11.06.2026 57.73%
Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 1 of 6Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 2 of 6Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 3 of 6Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 4 of 6Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 5 of 6Enqlave By Aqasa, Al Furjan construction progress — 11 June 2026, 57.73% complete, photo 6 of 6

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Enqlave By Aqasa

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

161deals since 2023
13 811AED per m², median
1%resale, the rest bought from the developer
+35%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio36600 00016 66749
1 bedroom70975 00013 92967
2 bedrooms1141 470 00012 89541

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
10.08.20262 BR113.81 750 000
03.08.2026Studio35.9615 000
24.03.2026Studio36.1650 000
24.03.2026Studio35.8650 000
24.03.2026Studio36.0650 000
26.02.2026Studio36.0582 000
22.12.2025Studio36.0700 000
09.12.2025Studio36.0700 000
09.12.2025Studio35.9700 000
21.05.2025Studio35.8589 000
10.02.2025Studio36.1700 000
29.01.20251 BR69.8916 250
29.01.20252 BR117.01 445 300
29.01.20251 BR69.8916 250
28.01.20252 BR111.11 416 200
28.01.20251 BR69.9916 250
28.01.20252 BR116.51 475 100
28.01.20251 BR69.9916 250
22.01.20252 BR100.21 500 000
22.01.20252 BR117.51 490 000
22.01.20251 BR91.7975 150
22.01.20251 BR89.9975 150
13.01.20252 BR107.81 460 000
13.01.20252 BR116.51 485 000
06.01.20252 BR123.51 490 000
01.01.20252 BR123.11 460 250
27.12.20241 BR69.51 020 000
24.12.20241 BR89.5960 000
24.12.20241 BR90.6965 300
23.12.20242 BR113.81 460 000
19.12.20242 BR113.81 408 625
17.12.20242 BR113.81 525 000
17.12.20241 BR89.9985 000
17.12.20241 BR69.81 020 000
13.12.20241 BR89.9965 300
11.12.20242 BR112.01 490 000
11.12.20242 BR100.21 495 000
11.12.20242 BR113.71 515 000
09.12.20241 BR72.5995 000
06.12.20241 BR68.61 040 000
02.12.20241 BR69.8995 000
02.12.20241 BR69.9985 000
28.11.20242 BR110.71 500 000
28.11.20242 BR117.01 475 000
27.11.20241 BR69.8990 000
27.11.20241 BR69.8995 000
27.11.20242 BR123.11 455 300
26.11.20241 BR69.9965 250
25.11.20241 BR105.71 049 400
25.11.20241 BR69.9960 400

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 582 000 AED is 2 458 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Shared Pool
  • Shared Gym
  • Security
  • Covered Parking
  • Lobby in Building
  • Children's Play Area
  • Children's Pool
  • Barbecue Area
  • Pets Allowed
Enqlave By Aqasa

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Enqlave By Aqasa: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Enqlave By Aqasa is a residential development by Aqasa Homes Developers in Al Furjan, within Dubai’s Jebel Ali First area. The single-building project comprises 159 units in a G+P+10+R configuration. It is active, with construction recorded at 70.29% on an inspection dated 22 September 2026.

Project profile and building form

Enqlave By Aqasa is planned as one residential building with a ground floor, podium, 10 additional floors and a roof level. The development contains 159 units and has a total project area of 12,107.40. Its project start date is 28 May 2024. The project is located in Al Furjan, a residential community in the Jebel Ali First sector of Dubai. Al Furjan combines terraced housing, villas, apartment buildings and serviced residences. The district’s original layout was designed around clusters of homes connected by walkways and green areas, while later development has expanded its apartment offering.

Construction status

Enqlave By Aqasa has active status. Construction progress was recorded at 57.73% during the inspection dated 11 June 2026. The project began on 28 May 2024. The development consists of one building and 159 units, with no additional buildings within the project record. The active construction status and recorded completion ratio provide a defined progress position for a buyer reviewing an off-plan purchase. Enqlave By Aqasa is identified under project number 2959. Its residential building configuration is G+P+10+R, comprising a ground floor, podium, 10 floors and a roof level.

Al Furjan residential setting

Al Furjan is a residential community in Jebel Ali First. The original masterplan centred on terraced homes and detached villa clusters, with homes arranged around parks, walkways and landscaped areas. Its first phase included 819 houses with gardens and terraces. More than 30 parks and pedestrian connections form part of the original landscaping layout. Apartment towers and serviced residences have subsequently added to the community’s housing mix. Al Furjan includes 38 projects, while the immediate surrounding area contains a further 68 projects. This places Enqlave By Aqasa within a district that includes both established low-rise homes and newer residential buildings.

Road connections from Al Furjan

Al Furjan runs alongside the D591 road and has direct connections to E77, also known as Jebel Ali Road. Both corridors provide routes to Sheikh Zayed Road, Dubai’s main arterial highway. These road connections serve journeys towards Dubai Marina, Dubai International Airport, Mall of the Emirates and Downtown Dubai. The community is also commonly associated with nearby masterplan components including Masakin Al Furjan, alongside low-rise residential clusters and newer apartment developments. Al Furjan’s position in Jebel Ali First places it near Dubai Marina, Expo City Dubai, Palm Jumeirah and Al Maktoum International Airport.

Metro access

Al Furjan is served by the Dubai Metro Red Line extension, Route 2020. Station R72 is 851 metres from the community centre and is reachable on foot. Route 2020 provides a direct connection to the wider Red Line network and the Expo alignment. This metro service sits alongside the district’s D591 and E77 road links. Enqlave By Aqasa is located in Al Furjan, so the project forms part of a community with access to both the Route 2020 metro extension and road routes connecting with Sheikh Zayed Road.

Key destinations from Al Furjan

Dubai Marina is 6.2 km from Al Furjan, while JBR Beach is 6.1 km away. Expo City Dubai is 7.2 km from the community and Palm Jumeirah is 9.7 km away. Mall of the Emirates is 11.7 km from Al Furjan, and Al Maktoum International Airport is 14.4 km away. Global Village is 17.0 km away, followed by Business Bay at 21.5 km. Burj Khalifa and Downtown Dubai are 23.1 km from the community, while The Dubai Mall is 23.4 km away. Dubai International Financial Centre is 24.9 km away and Dubai International Airport is 33.6 km away.

Developer

Aqasa Homes Developers is the developer of Enqlave By Aqasa. The company is associated with a 159-unit residential project in Al Furjan, structured as one G+P+10+R building. Construction commenced on 28 May 2024, and the project is active. The recorded construction progress is 70.29%, based on the inspection dated 22 September 2026. Enqlave By Aqasa has project number 2959 and a total project area of 12,107.40. The development is positioned in Al Furjan, within the Jebel Ali First area of Dubai.

Frequent questions

Who is the developer of Enqlave By Aqasa?
Enqlave By Aqasa is developed by Aqasa Homes Developers.
Where is Enqlave By Aqasa located?
The project is located in Al Furjan, within Dubai’s Jebel Ali First area.
What is the construction status of Enqlave By Aqasa?
The project is active. Construction was recorded at 70.29% on an inspection dated 22 September 2026.
How many units are in Enqlave By Aqasa?
Enqlave By Aqasa comprises 159 units in one residential building.
What is the building configuration of Enqlave By Aqasa?
The project is a G+P+10+R residential building, with a ground floor, podium, 10 floors and a roof level.
When did construction start at Enqlave By Aqasa?
The project start date is 28 May 2024.
Is there metro access from Al Furjan?
Al Furjan is served by the Dubai Metro Red Line extension, Route 2020. Station R72 is 851 metres from the community centre.
What is nearby Al Furjan?
Dubai Marina is 6.2 km from Al Furjan, JBR Beach is 6.1 km away, and Expo City Dubai is 7.2 km away.
How can I buy an apartment in Enqlave By Aqasa?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Enqlave By Aqasa between 25 Nov 2024 and 10 Aug 2026: median 13 474 AED/m² (1 252 AED/sq ft); half of the deals fell between 12 618 and 14 952 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 652 0001018 10336
1 BRAED 917 0002113 11969.9
2 BRAED 1 451 0001912 748113.8
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Al Furjan: new projects and prices

30 projects · prices from DLD and developers

  1. Azizi Jewel Azizi Jewel Al Furjan · Studio, 1 BR from AED 513,000
  2. Azizi Neila Azizi Neila Al Furjan · Studio, 1 BR from AED 550,000
  3. Azizi Sikander Azizi Sikander Al Furjan · Studio, 1–2 BR from AED 550,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Enqlave By Aqasa worth?

DLD has recorded 161 sales in this building since 2023, 2 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Enqlave By Aqasa — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/enqlave-by-aqasa-al-furjan/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.