Developer: Bottega Nove By Lalav Real Estate Development · Majan
Bottega Nove By Lalav is a residential project by Bottega Nove By Lalav Real Estate Development in Majan, Dubai, with handover Q3 2027, construction 30% complete per the DLD registry, 60 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 2 Bedroom | 22 | 1 364–1 743 |
| 3 Bedroom | 32 | 1 919–2 648 |
| Other units | 6 | 825–2 616 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
For UAE residents the down payment starts at 20% with terms up to 25 years. Estimate your payment and purchase costs for your budget.
Estimates only; not a bank approval.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 11.10.2026 09:55).
Pace: 2.49% per month. At this rate 100% falls on 13.12.2028.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Bottega Nove By Lalav Real Estate Development · District: Majan
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.08.2026 | 2 BR | 133.4 | 1 803 007 |
| 21.07.2026 | 3 BR | 187.7 | 2 454 245 |
| 20.07.2026 | 3 BR | 178.3 | 2 102 719 |
| 20.07.2026 | 3 BR | 187.7 | 2 215 202 |
Dubai Land Department transaction registry, updated 10.10.2026. Explore Dubai property transactions →
Bottega Nove By Lalav is a 60-unit development in Majan, within DubaiLand. It is being developed by Bottega Nove By Lalav Real Estate Development. The project is active, with construction recorded at 30.04% complete on 12 August 2026 and completion scheduled for 30 July 2027.
Bottega Nove By Lalav is registered as project number 4324 and occupies a total area of 10,572.60. The development comprises 60 units. Construction commenced on 4 April 2025, and the project has an active status. The scheduled completion date is 30 July 2027. At the inspection dated 12 August 2026, the reported completion ratio was 30.04%. These figures place the project in its construction phase, with the stated completion date falling in 2027.
The development started on 4 April 2025. Its construction status is active, and the completion ratio was recorded at 30.04% on 12 August 2026. The scheduled completion date is 30 July 2027. Bottega Nove By Lalav has 60 units across a total project area of 10,572.60. The project’s identification number is 4324, which is shared across its project registration details. The available project timeline identifies the start date, the inspection date, the active construction status and the scheduled completion date.
Bottega Nove By Lalav is located in Majan, a mixed-use community in the DubaiLand master area and within Wadi Al Safa 3. Majan was launched in November 2006 by Mizin, Tatweer’s development arm. The community covers 16.5 million square feet and was planned as a district containing residential, commercial, retail and entertainment uses. Its original master plan, prepared by Halcrow, envisaged a skyline of 150 towers. The planned land-use split allocated one third to residential use, one quarter to commercial use and the remaining area to retail and entertainment.
Road travel is the primary form of access for Majan. From the Majan community centroid, Global Village is 2.6 km away, while Mall of the Emirates is 12.1 km away. The Dubai Mall is 12.4 km away and Burj Khalifa and Downtown Dubai are 12.5 km away. Business Bay is 11.7 km away, DIFC is 13.8 km away and Dubai International Airport is 18.6 km away. Dubai Marina is 17.8 km away, Palm Jumeirah is 18.1 km away and JBR Beach is 18.6 km away. Al Maktoum International Airport is 26.8 km away, while Expo City Dubai is 22.3 km away.
Majan is not directly served by a metro station. The nearest identified Dubai Metro Red Line station is R29, at a distance of 11,422 metres. The community is visible from surrounding arterial roads and sits within the wider DubaiLand precinct. Safa Tower and Al Rabia Tower are two taller buildings in the vicinity, above the generally mid-rise local profile. The community coordinates are 25.091482, 55.317071. Majan’s position within DubaiLand connects the area by road to central Dubai employment districts, leisure destinations and DubaiLand attractions.
Majan’s Phase 1 roads and basic services were completed in 2007, enabling plot handovers to property developers. Development across the community has proceeded in phases, with the master plan later adjusted to accommodate smaller plot developments. By 2020, Majan contained 28 completed buildings and 25 further structures at stages of construction, modification or pause. Current and completed projects in the wider area include Aras Heights, Aras Residence, Barari Views, Jade Tower, Lazord by LAPIS and Madison Residences. This reflects the mix of completed, active and planned development within Majan.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Bottega Nove By Lalav — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/bottega-nove-by-lalav-majan/