Dubai Lagoon

Dubai Lagoon is a district of Dubai, 3.2 km from Dubai Investment Park Metro Station.

About the area

Dubai Lagoon is a large-scale residential masterplan within Dubai Investments Park (DIP) that was launched in 2005 and remains incomplete. The scheme was conceived around two man-made lagoons and a broad masterplan spanning seven zones across a 5.7 million sq ft site. The project has a troubled legal and delivery history: it was launched off-plan in 2005, experienced extended delays and contractor failures, and has been officially marked as “under cancellation” by the Dubai Land Department after a prolonged delay.

What this place is and where it is

Dubai Lagoon was proposed as a low- to mid-rise apartment community within Dubai Investments Park, positioned near The Green Community and with direct road access toward Sheikh Zayed Road and the Emirates Road. The masterplan described in original documents comprised multiple residential blocks arranged around two artificial lagoons, supportive landscaping and a commercial centre offering retail and leisure facilities. Over time different sources and records refer to the project in slightly different forms — the development is described in some documents as a 53-building project and elsewhere as 54 mid-rise buildings; the launch materials referenced a first phase of 21 buildings (ground-plus-six and ground-plus-eight) intended to accommodate 4,166 units.

Dubai Lagoon

Transport and distances

Public transport and major destinations relative to Dubai Lagoon:

  • Nearest metro line: Red Line (station code R74). The recorded straight-line distance to this station is about 3,213 m — not considered walkable as a practical daily connection.
  • Burj Khalifa / Downtown Dubai: 24.8 km
  • The Dubai Mall: 25.1 km
  • Dubai International Airport (DXB): 34.6 km
  • Al Maktoum International Airport (DWC): 10.6 km
  • Palm Jumeirah: 14.3 km
  • Dubai Marina: 10.9 km
  • JBR Beach: 11.1 km
  • Mall of the Emirates: 14.4 km
  • Business Bay: 23.3 km
  • Expo City Dubai: 4.7 km
  • Global Village: 15.4 km
  • Dubai International Financial Centre (DIFC): 26.6 km

The site’s proximity to Expo City Dubai and to the new road infrastructure planned at the time of launch was a key element in the original marketing and access strategy.

Dubai Lagoon

Development history and construction status

Key milestones and events, drawn from public records and contemporaneous reports:

  • Project launch: December 2005, with an initial forecast completion in September 2007.
  • Masterplan: seven zones across about 5.7 million sq ft, residential blocks around two man-made lagoons; the first phase included 21 ground-plus-six and ground-plus-eight buildings planned to deliver 4,166 units.
  • Early delays arose when transport authorities sought land needed for road and metro alignments linking the city to the new airport and the Expo 2020 area; this affected permission to build on parts of the planned site.
  • Rising construction costs and contractor financial difficulties followed as the regional market tightened; contractors at various points defaulted or ceased work rather than complete under increasingly costly conditions.
  • Legal and regulatory actions: the Real Estate Regulatory Agency (RERA) was established in 2008 and subsequently engaged with investor complaints. Court rulings and regulator involvement followed, including a reported investor legal victory in 2009.
  • Later developments included partial transfers of ownership: in 2017 a portion of the unfinished development was sold to another developer, and in 2018 the Dubai Land Authority took control of certain assets linked to the original developer. Reports note that only the shells of a small number of apartment blocks remained on site as visible evidence of the original scheme.
  • Official status: the project has been recorded by authorities as having been placed “under cancellation” by the Dubai Land Department after many years of delay.
  • Market activity: publicly published transaction data records multiple sale transactions for the development, with a stated count of 50 sale transaction records available under government open-data publications.
Dubai Lagoon

Urban fabric, planned amenities and site layout

Original marketing and documentation described a mixed residential community with the following planned elements:

  • Two man-made lagoons surrounded by landscaping and residential buildings.
  • A commercial centre with retail elements and services listed in launch materials: supermarket, laundry, gym, multiple swimming pools, sauna, Jacuzzi, squash courts, tennis courts and a mosque.
  • A proposed golf course was referenced as part of the broader leisure and open-space concept around the residential zones.

The scheme was presented as a masterplanned cluster of mid-rise buildings rather than a high-density tower neighbourhood. Documentation also highlighted vehicular access toward major arterial routes serving DIP and connections toward central Dubai and southern road links.

Dubai Lagoon

Who this area is for

Given the project’s status and history, the primary audiences for information about Dubai Lagoon are:

  • Existing off-plan purchasers and title holders seeking a factual summary of the project’s public record and regulatory steps taken to date.
  • Legal, asset-management and recovery professionals engaged with incomplete developments or with portfolios containing units in the scheme.
  • Researchers and market analysts reviewing masterplanned developments, delivery risk and the effects of infrastructure planning on private projects.

For any party considering a transaction or legal action related to Dubai Lagoon, the relevant official registers and the Dubai Land Department records should be consulted directly for the most current position on ownership, transaction history and the project’s administrative status.

Dubai Lagoon

FAQ

Is Dubai Lagoon completed?
No. The development remains incomplete and has been recorded as under cancellation by the Dubai Land Department after an extended delay.

Who was responsible for the development?
The project was launched in the mid-2000s by Schön Properties and associated development entities; launch materials also referenced Town Centre Management Ltd and sponsorship links to local investors. The masterplan and architectural work were attributed to regional design firms involved at the time.

How many buildings and units were planned?
Launch documentation described a masterplan of over fifty mid-rise buildings arranged around two lagoons. Early phase materials specified a first phase of 21 buildings designed to deliver about 4,166 units; other sources refer to 53 or 54 buildings in total within the full scheme.

What remains on site today?
Public reporting noted that a limited number of building shells remain on site as evidence of the original development. Subsequent asset transfers and regulatory actions were reported in later years.

Service charges in Dubai Lagoon, 2026

Area median16.84 AED▲ +14.4% per sq ft per year · 181 AED/m²
Range across buildings5.6–26.5buildings with a budget: 14
vs Dubai median▲ +5.5%Dubai 15.96 AED/sq ft
General / reserve fund15.71 / 0.96medians, AED/sq ft

Largest management companies in the area: P I D Owners Association Management (12), Amal Owners Community Management (2).

Check any building’s service charge → All communities

RERA-approved 2026 budgets from the DLD service charge index (Mollak); residential buildings. Rate is AED per sq ft per year; YoY compares the same buildings in 2025.

Resale properties — Dubai Lagoon

Found 0
View

Nothing found. Try relaxing the filters.

Areas inside Dubai Lagoon

Nearby areas

Neighbouring areas and sub-communities to compare location and prices.

Frequent questions

Is Dubai Lagoon well-connected by metro?
The nearest metro station is approximately 3.2 km away, on the Red Line.
How can I buy property in Dubai Lagoon?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you find a unit in this area.
Request
Request