by Tabeer Developments in Arjan
Parkside Boulevard is a residential project by Tabeer Developments in Arjan, Dubai, with handover 27.12.2027, construction 51.9% complete per the DLD registry.
Payment plan 60/40
- Down payment10%
- During construction50%
- On handover40%
Construction progress
- Handover27.12.2027
- Status date20.05.2026
- DLD project number3326
Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Tabeer Developments · District: Arjan
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 11.05.2026 | 1 BR | 123.7 | 1 430 000 |
| 30.04.2026 | 1 BR | 107.3 | 1 399 440 |
| 29.04.2026 | Studio | 42.3 | 667 000 |
| 29.04.2026 | 1 BR | 83.9 | 1 181 880 |
| 27.04.2026 | 1 BR | 107.3 | 1 428 225 |
| 13.04.2026 | Studio | 42.5 | 699 000 |
| 13.04.2026 | Studio | 41.8 | 750 000 |
| 10.04.2026 | 1 BR | 78.0 | 1 230 000 |
| 10.04.2026 | 2 BR | 156.9 | 1 821 456 |
| 10.04.2026 | 1 BR | 77.2 | 1 205 000 |
| 08.04.2026 | 2 BR | 144.1 | 1 741 392 |
| 08.04.2026 | 1 BR | 123.7 | 1 435 940 |
| 02.03.2026 | 2 BR | 144.1 | 1 612 750 |
| 16.02.2026 | Studio | 42.5 | 741 510 |
| 09.02.2026 | 1 BR | 77.9 | 1 187 900 |
| 30.01.2026 | 2 BR | 117.3 | 1 750 000 |
| 27.01.2026 | Studio | 42.5 | 750 000 |
| 26.01.2026 | Studio | 42.5 | 700 000 |
| 20.01.2026 | Studio | 42.2 | 700 000 |
| 19.01.2026 | 1 BR | 93.5 | 1 075 000 |
Dubai Land Department transaction registry, updated 2026-08-09. Explore Dubai property transactions →
Places nearby
About the project
Parkside Boulevard is a one-building residential development in Arjan by Tabeer Real Estate Development. It comprises 171 units, with one- and two-bedroom apartments, and has an active project status. The reported completion ratio is 51.93%, with project completion scheduled for 27 December 2027.
The project and building configuration
Parkside Boulevard is planned as a single residential building containing 171 units. Its registered configuration is B + G + 9, with a gym and pool on the roof. The building is designed with a concrete structure and blockwork, followed by internal and external finishes. The project began on 14 November 2024 and is scheduled to complete on 27 December 2027. Its total recorded project area is 14,975.51. The development sits in Arjan, a mixed-use residential and leisure neighbourhood within Dubai’s Al Barsha South area. Arjan is positioned near the junction of Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road.
Apartments at Parkside Boulevard
The residences at Parkside Boulevard are one- and two-bedroom apartments. The project’s 171-unit count is contained within one building, rather than a multi-building scheme. The development is located in Arjan, where the residential setting includes apartment communities, retail plots and leisure attractions. Arjan has a development pattern of mid-rise residential blocks and planned retail components. The district is part of the wider DubaiLand masterplan and is served by arterial-road connections through Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road. Parkside Boulevard’s B + G + 9 layout places the gym and pool at roof level.
Amenities and rooftop facilities
Parkside Boulevard includes a rooftop gym and pool within its registered building configuration. The amenity programme also includes a beach pool, rooftop plunge pool, fitness studios, a sauna room and a meditation podium. Residents are planned to have access to an outdoor cinema, an indoor kids’ play area and an outdoor family barbecue area. Dining outlets, restaurants, retail outlets, parks and leisure areas are also included in the project’s listed facilities. The amenity selection combines fitness, swimming, children’s recreation, outdoor social space and on-site retail and dining components. These facilities are provided within a project planned as a single 171-unit building in Arjan.
Arjan location and nearby places
Parkside Boulevard is in Arjan, in Dubai’s Al Barsha South area. Arjan Family Park is 0.3 km from the project, while Arjan Activities Park and Diamond Park Arjan are each 0.4 km away. Dubai Miracle Garden is 0.7 km away. Cinepolis at Circle Mall is 2.3 km away, and Arabian Ranches Golf Club is 3.3 km away. The Els Golf Club is 3.5 km away, while Trump International Golf Club is 4.2 km away. The district is located north of Dubai Motor City and close to Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road. Arjan contains residential, retail, hotel and office components across its development zones.
Travel connections
Mall of the Emirates is 10 minutes from Parkside Boulevard. Downtown Dubai is 20 minutes away, and Al Maktoum International Airport is also 20 minutes away. Dubai International Airport is 25 minutes away. Arjan is connected to Dubai’s road network through Sheikh Mohammed Bin Zayed Road and Umm Suqeim Road. The nearest listed Dubai Metro station for the wider Arjan area is Red Line station R33, at 7,818 metres from the community. Dubai Miracle Garden and Dubai Butterfly Garden are leisure attractions within Arjan, while Global Village is 6.9 km from the wider neighbourhood. The location combines road access with nearby parks, attractions and residential services.
Payment plan and scheduled completion
The payment plan allocates 10% as a down payment on the booking date. A further 50% is payable during construction through the first to ninth instalments. The remaining 40% is due on handover, at 100% completion. Parkside Boulevard has an active status and a reported completion ratio of 51.93%. Construction commenced on 14 November 2024. The scheduled completion date is 27 December 2027. The payment structure divides the purchase price between booking, construction-stage instalments and handover. The project is registered as one building with 171 units and a B + G + 9 configuration that includes a rooftop gym and pool.
Registered transactions in Parkside Boulevard
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +2% over the same period, so the building grew faster.
What buyers actually paid
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 42 | 677 200 | 16 124 | 49 |
| 1 bedroom | 84 | 1 152 480 | 13 720 | 55 |
| 2 bedrooms | 144 | 1 636 640 | 11 366 | 20 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

































