Dubai Square Mall

Dubai Square Mall is located in Dubai Creek Harbour, Dubai, 3.3 km from Creek Metro Station.

PDF shortlist · updated 1 November 2026

New Dubai projects of November 2026

30 projects · prices from DLD and developers

  1. Rise By Athlon 1 Rise By Athlon 1 Wadi Al Safa 5 · 1–3 BR from AED 1,412,000
  2. Zuha Island Villas Zuha Island Villas World Islands from AED 68,000,000
  3. Weybridge Gardens Phase 5 by Leos Developments Weybridge Gardens Phase 5 by Leos Developments Dubailand Oasis from AED 756,782

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

About this place

Dubai Square Mall is the core of a new entertainment and retail district within Dubai Creek Harbour. Conceived as a compact urban quarter rather than a single building, the development combines extensive retail space, hotels, leisure attractions and thousands of homes around the future Dubai Creek Tower. The masterplan aims to create a series of interconnected streets, plazas and covered boulevards that link indoor attractions with outdoor public spaces.

What this place is and where it is located

Dubai Square is being developed by Emaar as a distinct district inside Dubai Creek Harbour. The 2.6-square-kilometre (one-square-mile) entertainment complex is planned as a mixed-use neighbourhood centred on shopping, dining, events and family attractions. The Square will have a direct visual relationship with Dubai Creek Tower, with public squares and avenues oriented towards the tower.

Dubai Square Mall

Transport and distances

The nearest metro reference is the Green Line station coded G30, approximately 3.3 km away. Within the masterplan, the project includes connections between levels and a planned second-floor metro link, supporting access to the wider public transport network.

  • Metro: Green Line station (code G30), approximately 3.3 km away.
  • Internal circulation: three levels connected by covered boulevards, plazas and a second-floor public-transport link.
  • Vehicle access: electric vehicles will be able to access interior spaces.
Dubai Square Mall

Masterplan, scale and building programme

Dubai Square is planned as a multi-phase project with a substantial construction budget and a broad mix of uses.

  • Land area: about 2.6 km² (one square mile).
  • Retail gross floor area: 750,000 square metres, with roughly two thirds planned for Phase 1 and the remainder for Phase 2.
  • Residential accommodation: 9,262 apartments and houses.
  • Hotel capacity: 1,563 rooms across the district.
  • Project budget: an estimated AED 180 billion for the wider development.

Brewer Smith Brewer Group (BSBG) is the lead consultant and executive architect, while Emaar is developing the district and shaping its urban character and programming.

Dubai Square Mall

Urban layout and uses

The masterplan is structured around a hierarchy of streets and public spaces, combining covered and open-air environments across three levels.

  • Ground floor: event arenas, streets, alleys and plazas for markets, performances and gatherings, with food courts and a supermarket along routes leading towards the central tower plaza.
  • First floor: a wide covered central boulevard aligned with Dubai Creek Tower, featuring cafés, restaurants and branded retail. This level will serve as a main circulation route and event platform.
  • Second floor: family attractions including an Ice Adventure area, water park, cineplex, additional retail and a planned metro link.

Architectural strategies blend indoor retail with outdoor urban spaces. Roof forms and shading devices draw on regional precedents, including mashrabiya patterns and filtered light, creating a controlled daylight environment described as a “rain of light”. Streets, courtyards and piazzas are arranged for sunlit events, public art and performances.

Dubai Square Mall

Amenities, technology and visitor experience

Dubai Square is positioned as a technology-focused destination as well as a retail and leisure hub. It aims to attract global technology brands and showcase emerging industries including sustainable technologies, 3D printing, drones and artificial intelligence.

  • Omnichannel retail combining physical stores with digital platforms, including click-and-collect and mobile payments.
  • Custom mobile applications, quick checkout solutions and barcode- or RFID-enabled shopping.
  • Large event arenas and public piazzas for exhibitions, performances and product showcases.
  • Family attractions including an ice-themed attraction, water-park features and a multi-screen cineplex.

These elements are intended to make the district a regional destination for visitors and a daily amenity for Dubai Creek Harbour residents.

Dubai Square Mall

Who the district suits

With residences, hotels, extensive leisure facilities and retail space, Dubai Square is designed for several groups:

  • Visitors and tourists seeking entertainment, major shopping and hotel accommodation close to Dubai Creek Tower.
  • Residents of Dubai Creek Harbour and nearby neighbourhoods looking for daily retail, dining and leisure options.
  • Technology and lifestyle brands seeking a showcase environment that combines physical and digital retail with event spaces.

FAQ

What is Dubai Square?
Dubai Square is a planned 2.6 km² mixed-use district at Dubai Creek Harbour, combining retail, entertainment, hotels and residential buildings around boulevards and public squares oriented towards Dubai Creek Tower.

Who is delivering the project?
Emaar is leading the development, with Brewer Smith Brewer Group (BSBG) serving as lead consultant and executive architect.

How large is the retail and hospitality offer?
Dubai Square is planned to include approximately 750,000 sqm of gross retail floor area and 1,563 hotel rooms. About two thirds of the retail space is planned for Phase 1.

What transport links are referenced?
The Green Line station coded G30 is approximately 3.3 km away. The masterplan also includes a planned second-floor metro link, internal circulation routes and electric-vehicle access.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. Every field carries its origin.

How to cite:Dubai Square Mall — Continental Club Property, 2026-07-30, https://continentalclub.ae/location/dubai-square-mall/

Service charges in the DLD area “Al Khairan First”, which includes Dubai Square Mall, 2026

DLD area median21.07 AED▲ +7.3% per sq ft per year · 227 AED/m²
Range across buildings16.3–35.5buildings with a budget: 19
vs Dubai median▲ +31.5%Dubai 16.02 AED/sq ft
General / reserve fund19.37 / 1.46medians, AED/sq ft

Largest management companies in the area: Emaar Community Management (14), Emaar Hospitality Community Management (5).

Check any building’s service charge → All communities

RERA-approved 2026 budgets from the DLD service charge index (Mollak); residential buildings. Rate is AED per sq ft per year; YoY compares the same buildings in 2025.

Nearby areas

Neighbouring areas and sub-communities to compare location and prices.

Dubai Creek Harbour, DubaiDubai Creek Harbour53 projectsCreek Beach, Dubai Creek HarbourCreek BeachDubai Creek Harbour12 projectsCreek Island, Dubai Creek HarbourCreek IslandDubai Creek Harbour11 projectsGreen Gate, Dubai Creek HarbourGreen GateDubai Creek Harbour3 projectsMusic Colour and Fire Plaza, Dubai Creek HarbourMusic Colour and Fire PlazaDubai Creek HarbourFlamingo Creek, The LagoonsFlamingo CreekThe LagoonsRas Al Khor, DubaiRas Al Khor1 projectThe Lagoons, DubaiThe Lagoons

Your broker for this area

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Handles sales and rentals in Dubai Square Mall: off-plan, resale and leasing. English and Russian.

Frequent questions

Is Dubai Square Mall well-connected by metro?
The nearest metro station is approximately 3.3 km away, on the Green Line.
How can I buy property in Dubai Square Mall?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you find a unit in this area.

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.