Developer: Emaar Properties · Creek Island
Creekside 18 is a residential project by Emaar Properties in Creek Island, Dubai, with prices from AED 1 246 888, ready to move in, 506 units.
| Type | Units | Size, sq.ft |
|---|---|---|
| 1 Bedroom | 133 | 673–1 091 |
| 2 Bedroom | 212 | 1 118–1 575 |
| 3 Bedroom | 154 | 1 613–3 223 |
| 4 Bedroom | 1 | 4 185 |
| NA | 6 | 1 206–3 579 |
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 23.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Emaar Properties · District: Creek Island
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 10.08.2026 | 3 BR | 150.0 | 3 650 000 |
| 10.08.2026 | 3 BR | 150.0 | 2 920 000 |
| 06.08.2026 | 1 BR | 62.6 | 1 537 000 |
| 05.08.2026 | 2 BR | 104.6 | 1 637 383 |
| 28.07.2026 | 3 BR | 150.3 | 3 500 000 |
| 27.07.2026 | 1 BR | 62.6 | 1 500 000 |
| 22.07.2026 | 2 BR | 106.1 | 2 700 000 |
| 22.07.2026 | 2 BR | 106.1 | 1 350 000 |
| 14.07.2026 | 2 BR | 104.0 | 1 545 000 |
| 13.07.2026 | 1 BR | 62.6 | 1 520 001 |
| 03.07.2026 | 3 BR | 150.1 | 3 750 000 |
| 03.07.2026 | 3 BR | 150.1 | 2 900 000 |
| 02.07.2026 | 3 BR | 149.9 | 3 000 000 |
| 02.07.2026 | 3 BR | 150.0 | 1 800 000 |
| 29.06.2026 | 3 BR | 149.9 | 3 400 000 |
| 29.06.2026 | 3 BR | 149.9 | 2 720 000 |
| 08.06.2026 | 1 BR | 62.6 | 1 132 560 |
| 04.06.2026 | 2 BR | 106.3 | 2 765 000 |
| 18.05.2026 | 3 BR | 150.5 | 3 550 000 |
| 18.05.2026 | 3 BR | 150.5 | 2 840 000 |
| Date | Type | Size, m² | Rent, AED/yr |
|---|---|---|---|
| 1bed room+Hall | 62.9 | 80 000 | |
| 1bed room+Hall | 62.7 | 72 000 | |
| 2 bed rooms+hall | 104.9 | 130 000 | |
| 1bed room+Hall | 62.6 | 85 000 | |
| 2 bed rooms+hall | 106.3 | 145 000 | |
| 2 bed rooms+hall | 104.9 | 138 000 | |
| 3 bed rooms+hall | 150.5 | 185 000 | |
| 2 bed rooms+hall | 104.9 | 165 000 | |
| 1bed room+Hall | 62.9 | 70 000 | |
| 1bed room+Hall | 62.6 | 75 000 | |
| 3 bed rooms+hall | 150.3 | 221 000 | |
| 2 bed rooms+hall | 125.0 | 200 000 | |
| 2 bed rooms+hall | 104.7 | 125 000 | |
| 2 bed rooms+hall | 104.9 | 110 000 | |
| 1bed room+Hall | 88.1 | 95 000 | |
| 2 bed rooms+hall | 104.6 | 120 000 | |
| 3 bed rooms+hall | 150.1 | 210 000 | |
| 1bed room+Hall | 62.9 | 80 000 | |
| 2 bed rooms+hall | 104.5 | 120 000 | |
| 2 bed rooms+hall | 125.5 | 150 000 |
Dubai Land Department transaction registry, updated 2026-08-22. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +4% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 63 | 946 888 | 15 030 | 275 |
| 2 bedrooms | 105 | 1 696 888 | 16 161 | 430 |
| 3 bedrooms | 150 | 3 041 888 | 20 279 | 314 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2022 to 2025 — +22% on the price per square metre in this building. The district moved +33% over the same period, so the building lagged the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Creekside 18 is a finished apartment development by Emaar Properties on Creek Island in Dubai Creek Harbour. It comprises two residential towers with podium apartments and an annex tower, and is ready to move in with 100% completion recorded.
Creekside 18 is arranged as two residential towers, Tower A and Tower B, each rising 37 storeys above a configuration of two basement levels, a ground floor and three podium levels. The development also includes a 32-level annex tower and an additional level of podium apartments. The registered project includes three buildings and 506 units. The towers form part of the waterfront setting of Dubai Creek Harbour, close to the bird sanctuary and green mangroves. Apartment outlooks include the canal, waterfront and park, with panoramic windows and balconies forming part of the residential layouts. The residential interiors use a modern palette of grey and beige, with marble, glass, wood and stone among the stated materials.
The residence collection consists of one-, two- and three-bedroom apartments, alongside podium apartments. Apartments are specified with fully equipped kitchens and stone kitchen countertops. Balconies and panoramic windows are included within the apartment layouts, with views described across the canal, waterfront and park. The project’s two 37-storey towers provide the principal residential accommodation, while the podium level adds a further apartment component. Creekside 18 is an apartment-only residential development rather than a villa or townhouse scheme, making its unit mix focused on one- to three-bedroom homes within the Creek Island setting.
Resident facilities include a gym, leisure pool, children’s playgrounds and a multifunctional hall. The development also provides valet parking, 24-hour security and CCTV. Shops and restaurants are listed among the on-site facilities. Ground-floor services at Creekside 18 include Caribou Coffee, Mediclinic, Pet Dreamland and Black Mustache Gents Salon. These uses place a coffee shop, medical clinic, pet shop and men’s salon within the development. Additional nearby retail and service options include Al Douri Signature supermarket at 0.1 km, plus Spinneys, Geant Express, Mondoux restaurant, Lan Shan Restaurant, Saffron Palace and Life Pharmacy at 0.2 km.
Creekside 18 is located on Creek Island within Dubai Creek Harbour. Creek Island Central Park is 0.4 km from the development, and Creekside Park Dubai Creek Harbour is 0.7 km away. Imagine at Dubai Festival City is 2.0 km away, while Ras Al Khor Wildlife Sanctuary is 2.5 km away and Jameel Arts Centre is 2.8 km away. Al Badia Golf Club is 2.2 km from Creekside 18, and Dubai Creek Golf & Yacht Club is 4.6 km away. For cinema access, Novo Cinema at Dubai Festival City Mall is 2.2 km away, VOX Cinemas at Grand Hyatt Dubai is 3.2 km away, and Vox Cinemas at Deira City Centre is 5.5 km away.
Creekside 18 is finished, with a recorded completion ratio of 100%. The recorded completion date is 31 May 2020, and the development is ready to move in. The starting price is AED 1,246,888. The stated payment structure is a 50/50 post-handover plan: 25% at booking, 25% on handover and the remaining 50% after handover over 24 months. As the project is complete, the handover stage has already been reached. Buyers considering a residence can focus on available completed apartments within the one-, two- and three-bedroom collection.
Emaar Properties is the developer of Creekside 18 and was founded in 1997. Its portfolio includes Dubai Mall, Burj Khalifa, Dubai Marina and Downtown Dubai. Creekside 18 sits within Dubai Creek Harbour, a waterfront masterplan developed through a joint venture between Emaar Properties and Dubai Holding. The project’s Creek Island position places its two residential towers, podium apartments and annex tower within this wider Dubai Creek Harbour setting.
Dubai market as a whole: prices, transactions and trends (DLD data) →
Managed by Emaar Community Management · budget 1 Jan 2026 — 31 Dec 2026
History, budget breakdown and nearby buildings →
RERA-approved budget from the DLD service charge index (Mollak) for “Creekside 18”. Total is the general and reserve funds; additional charges are separate.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.