Developer: Aa And Hmb Real Estate Development · Jumeirah Village Circle
Havelock Heights is a residential project by HMB Homes Real Estate Development in Jumeirah Village Circle, Dubai, with handover 15.09.2026, construction 28% complete per the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: HMB Homes Real Estate Development · District: Jumeirah Village Circle
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 23.06.2026 | 1 BR | 82.9 | 1 250 000 |
| 15.06.2026 | Studio | 34.6 | 650 000 |
| 02.06.2026 | Studio | 34.5 | 650 000 |
| 14.05.2026 | Studio | 34.5 | 703 250 |
| 03.04.2026 | 2 BR | 104.2 | 1 450 000 |
| 13.03.2026 | 2 BR | 104.2 | 1 550 000 |
| 09.03.2026 | 2 BR | 103.9 | 1 584 000 |
| 06.03.2026 | 2 BR | 104.2 | 1 600 000 |
| 05.03.2026 | 2 BR | 103.9 | 1 600 000 |
| 05.03.2026 | 1 BR | 82.9 | 1 230 000 |
| 04.03.2026 | 3 BR | 266.9 | 2 850 000 |
| 04.03.2026 | Studio | 34.7 | 725 000 |
| 04.03.2026 | Studio | 34.7 | 725 000 |
| 25.02.2026 | 1 BR | 82.9 | 1 250 000 |
| 23.02.2026 | 1 BR | 73.4 | 1 127 000 |
| 23.02.2026 | 2 BR | 104.2 | 1 550 000 |
| 20.02.2026 | Studio | 34.6 | 674 240 |
| 06.02.2026 | 1 BR | 72.3 | 1 150 000 |
| 25.11.2025 | 3 BR | 267.6 | 3 000 000 |
| 04.11.2025 | 1 BR | 82.9 | 1 225 000 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 35 | 679 000 | 19 400 | 36 |
| 1 bedroom | 73 | 1 078 000 | 14 767 | 57 |
| 2 bedrooms | 104 | 1 550 000 | 14 904 | 14 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Havelock Heights is a single residential building with retail in Jumeirah Village Circle, within the registered area of Al Barsha South Fourth. Aa And Hmb Real Estate Development is developing the 156-unit project. It is active, with a reported completion ratio of 28.01% and a scheduled completion date of 15 September 2026.
Havelock Heights is planned as one building configured as G + 4P + 19F + R: a ground level, four podium levels, 19 residential floors and a roof level. The development includes residential accommodation and retail space. Its recorded total area is 11,181.01, and it contains 156 units. The building is designed with a concrete structure and blockwork, with internal and external finishes. Construction began on 15 September 2024, and the project is scheduled to complete on 15 September 2026. The development’s current status is active.
The project is located in Jumeirah Village Circle, a freehold master community developed by Nakheel and launched in 2005. JVC extends across more than 870 hectares and is organised into six districts. Its housing includes apartment buildings, townhouses and villas, while new residential and district-level projects continue to be delivered across the community. Havelock Heights is registered in Al Barsha South Fourth. JVC sits near the junction of Sheikh Zayed Road and Al Khail Road, with access points to Hessa Street. The community is largely car-oriented, with road connections serving central Dubai and established leisure and commercial areas.
From Jumeirah Village Circle, Dubai Marina is 7.3 km away, Palm Jumeirah is 9.3 km away, and JBR Beach is 8.0 km away. Mall of the Emirates is 6.9 km from the community. Downtown Dubai and Burj Khalifa are 17.0 km away, while Dubai Mall is 17.3 km away. Dubai International Airport is 27.0 km away, and Al Maktoum International Airport is 18.4 km away. Dubai Mall can take 21 minutes by car, while Palm Jumeirah and Dubai Marina can take 20 minutes; journey times vary by route and traffic. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations.
JVC combines established residential areas with ongoing construction and new services. Circle Mall is a retail development in the community planned with 235 shops, an anchor supermarket, two department stores, a multi-screen cinema, a health clinic, cafés, restaurants and a food court. The mall had topped out by July 2020, with its façade partly complete at that time. The wider JVC area includes 367 projects, with housing ranging from low- to mid-rise apartment buildings to townhouses and villas. Havelock Heights adds a further residential building with retail to this wider mix of homes and commercial uses.
Havelock Heights commenced on 15 September 2024. Its reported completion ratio is 28.01%, based on an inspection dated 25 June 2026. The project is active and is scheduled for completion on 15 September 2026. The planned building consists of 156 units within one structure, with four podium levels below 19 residential floors and a roof level. The recorded project configuration also includes retail. These details set out the project’s current construction position and its scheduled delivery date.
Havelock Heights is being developed by Aa And Hmb Real Estate Development. The company is responsible for a one-building project comprising 156 units in Jumeirah Village Circle. The development is planned as a residential building with retail, configured across a ground level, four podium levels, 19 floors and a roof level. Its construction programme began in September 2024 and has a scheduled completion date in September 2026.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.