Developer: Meraki Real Estate Development · Majan
The Haven Iii is a residential project by Meraki Developers in Majan, Dubai, with handover 31.12.2027, construction 6.2% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Meraki Developers · District: Majan
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 14.07.2026 | 2 BR | 126.9 | 1 659 866 |
| 11.05.2026 | 2 BR | 139.9 | 1 782 910 |
| 11.05.2026 | 2 BR | 117.8 | 1 712 897 |
| 11.05.2026 | 2 BR | 117.6 | 1 767 219 |
| 11.05.2026 | 2 BR | 117.8 | 1 767 069 |
| 11.05.2026 | 1 BR | 76.7 | 1 290 555 |
| 11.05.2026 | 2 BR | 135.9 | 1 764 929 |
| 25.03.2026 | 2 BR | 126.2 | 1 659 866 |
| 10.03.2026 | 2 BR | 141.3 | 1 729 423 |
| 24.02.2026 | 2 BR | 236.2 | 1 652 861 |
| 23.02.2026 | 2 BR | 118.5 | 1 465 828 |
| 18.02.2026 | 1 BR | 76.9 | 1 254 791 |
| 12.02.2026 | 2 BR | 126.2 | 1 577 209 |
| 11.02.2026 | 1 BR | 73.2 | 1 101 690 |
| 11.02.2026 | 1 BR | 74.7 | 1 087 919 |
| 11.02.2026 | 2 BR | 128.2 | 1 794 823 |
| 11.02.2026 | 2 BR | 135.9 | 1 935 092 |
| 11.02.2026 | 2 BR | 118.2 | 1 767 219 |
| 11.02.2026 | 1 BR | 73.2 | 1 101 690 |
| 09.02.2026 | 1 BR | 72.8 | 967 627 |
Dubai Land Department transaction registry, updated 2026-08-13. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 73 | 1 024 572 | 14 035 | 16 |
| 2 bedrooms | 126 | 1 676 347 | 13 304 | 35 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

The Haven III is an 85-unit residential development by Meraki Real Estate Development in Majan, within Wadi Al Safa 3. The single-building project comprises a ground floor, podium, seven typical floors and a roof. It is active, with construction progress recorded at 1.10% on 18 March 2026 and completion scheduled for 31 December 2027.
The Haven III is planned as one residential building with 85 units. Its configuration comprises a ground floor, podium, seven typical floors and a roof, creating a mid-rise residential format within Majan. The project’s recorded total area is 9,878.29. Construction commenced on 1 August 2025, and the scheduled project completion date is 31 December 2027. Meraki Real Estate Development is the developer of The Haven III. The development is located in Majan, a mixed-use community in the wider DubaiLand area and within the Wadi Al Safa 3 district of Dubai.
The Haven III is active. Construction progress was recorded at 1.10% following an inspection dated 18 March 2026. The project start date is 1 August 2025 and the scheduled completion date is 31 December 2027. The development consists of one building rather than a multi-building residential complex. Its 85-unit count and ground, podium, seven-floor and roof configuration define the current project structure. Buyers considering the development can assess it as an early-stage residential project with a stated end date in December 2027.
The Haven III is in Majan, a mixed-use community within DubaiLand and geographically part of Wadi Al Safa 3. Majan was launched in November 2006 and was planned with residential, commercial, retail and entertainment land uses. The original masterplan set aside one third of the community for residential use, one quarter for commercial use and the remaining land for retail and entertainment. The wider area has developed through a phased pattern, with completed buildings alongside projects under construction, modification or planning. Majan’s urban profile includes mid-rise development, with Safa Tower and Al Rabia Tower standing above the surrounding local skyline.
Road access is the principal mode of connectivity for Majan. The stated road distance from the community centroid to Global Village is 2.6 km. Downtown Dubai and Burj Khalifa are 12.5 km away, while The Dubai Mall is 12.4 km away and Business Bay is 11.7 km away. Mall of the Emirates is 12.1 km away and Dubai International Financial Centre is 13.8 km away. Dubai International Airport is 18.6 km away, while Al Maktoum International Airport is 26.8 km away. Dubai Marina is 17.8 km away, Palm Jumeirah is 18.1 km away and JBR Beach is 18.6 km away.
Majan is not directly served by a metro station. The nearest identified Dubai Metro Red Line station is R29, at a stated distance of 11,422 metres from the community. This places daily movement from The Haven III primarily on the road network rather than on direct walking access to the Metro. Expo City Dubai is 22.3 km away by road from the Majan community centroid. The development’s location therefore combines a DubaiLand setting with road links to central Dubai, major shopping destinations, airports and coastal districts.
Majan has evolved through incremental development since its original launch. Phase 1 roads and basic services were completed in 2007, enabling plot handovers to property developers. By 2020, the area contained 28 completed buildings and 25 additional structures at stages of construction, modification or pause. The masterplan was subsequently adapted to accommodate smaller plot developments. The current community includes active and completed residential projects by several developers. Within this setting, The Haven III adds a one-building, 85-unit residential project scheduled for completion on 31 December 2027.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.