Developer: Rijas Aces Property · JVC District 18
Dusit Princess is a residential project by RIJAS ACES in JVC District 18, Dubai, with prices from AED 430 000, handover Q4 2025, construction 64.1% complete per the DLD registry, 256 units.
| Type | Bedrooms | Size, sq.ft |
|---|---|---|
| Studios | studio | 472 |
| One bedroom | 1 | 754 |
| Two bedroom | 2 | |
| Three Bedroom | 3 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: RIJAS ACES · District: JVC District 18
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.07.2026 | Studio | 131.6 | 3 585 963 |
| 27.07.2026 | Studio | 123.5 | 3 413 889 |
| 27.07.2026 | Studio | 94.3 | 2 570 325 |
| 27.07.2026 | Studio | 120.4 | 3 318 069 |
| 20.07.2026 | Studio | 33.5 | 690 540 |
| 13.07.2026 | Studio | 38.7 | 941 948 |
| 13.07.2026 | Studio | 33.8 | 795 000 |
| 13.07.2026 | Studio | 31.5 | 797 000 |
| 03.06.2026 | Studio | 52.6 | 924 360 |
| 15.04.2026 | Studio | 31.1 | 719 650 |
| 06.04.2026 | 1 BR | 75.6 | 1 279 540 |
| 13.03.2026 | 1 BR | 75.6 | 1 569 301 |
| 05.02.2026 | Studio | 38.8 | 911 020 |
| 05.02.2026 | 1 BR | 60.2 | 1 143 888 |
| 14.01.2026 | Studio | 31.9 | 593 500 |
| 14.01.2026 | Studio | 31.5 | 699 950 |
| 12.01.2026 | Studio | 118.1 | 3 133 955 |
| 12.01.2026 | Studio | 109.0 | 3 079 774 |
| 12.01.2026 | Studio | 98.2 | 2 704 522 |
| 12.01.2026 | Studio | 109.0 | 3 149 507 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 39 | 550 000 | 14 103 | 173 |
| 1 bedroom | 72 | 884 947 | 12 291 | 42 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2022 to 2025 — +20% on the price per square metre in this building. The district moved +57% over the same period, so the building lagged the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Dusit Princess is a hotel apartment and branded-residence project in JVC District 18, within Jumeirah Village Circle, Dubai. It is being developed by RIJAS ACES and comprises 256 units in one building. The project is active and under construction, with a recorded completion ratio of 57.08%.
Dusit Princess is planned as a single residential hotel-apartment building with a ground floor, five podium levels, 17 floors and a roof level. The building is designed with a concrete structure, blockwork, and internal and external finishes. The project began on 1 April 2017 and has a recorded completion date of 31 August 2025. Its hotel-serviced apartment format combines residences with facilities including dining, wellness, work and event spaces. The development is located in JVC District 18, an area within the wider Jumeirah Village Circle community.
The residence collection includes studios, one-bedroom, two-bedroom and three-bedroom units. A studio is listed at 472.07 sq ft, while a one-bedroom apartment is listed at 753.66 sq ft. The apartments are presented as fully furnished hotel-serviced residences. The furnished specification includes Blissful Beds, Wedgwood chinaware, crystal glassware, a Nespresso machine and bespoke British minibars. Dusit Princess has 256 units in total, providing a residential offering within a hotel-apartment building rather than a conventional apartment-only development.
The amenity offering includes Namm Spa, D-Fit Gymnasium, an infinity pool and jacuzzi, a kids’ play area, a business centre and a co-working space. Dining and hospitality facilities include Soi Contemporary Thai, Splash Bar, an all-day gourmet bakery, a shisha lounge and a banquet hall. Retail shops are also included within the development. Smart check-in and check-out services form part of the guest-arrival facilities. Shuttle services are listed every 30 minutes to Dubai Mall, Mall of the Emirates, DIFC and Dusit Thani on Sheikh Zayed Road.
Dusit Princess is located in Jumeirah Village Circle’s District 18. The Circle Mall is listed 7 minutes from the project, while Els Club Golf is listed 13 minutes away. Dubai Marina is listed at 16 minutes, Palm Jumeirah at 18 minutes, Burj Al Arab at 15 minutes and Burj Khalifah at 19 minutes. Al Nakhla Park is listed 0.2 km away, Harmel Park 0.3 km away and Halfa Park 0.4 km away. The Els Golf Club is listed at 2.1 km, while Cinepolis at Circle Mall is listed at 2.3 km.
Prices at Dusit Princess start from AED 430,000. The stated payment structure begins with a 20% down payment on booking. A further 40% is payable during construction through the first to fourth instalments, followed by 10% on handover at 100% completion. The remaining 30% is payable post-handover within 24 months. This creates a two-year post-handover payment period. The project is also presented with a five-year payment plan and post-handover payments.
Handover for Dusit Princess is stated for Q4 2025. The project is active and under construction, with a recorded completion ratio of 57.08%. The recorded project completion date is 31 August 2025. Buyers considering the stated handover period can review the payment schedule alongside the construction-stage and post-handover portions of the plan: 40% during construction, 10% on handover and 30% within 24 months after handover.
Dusit Princess is developed by RIJAS ACES. The project is presented as a Dusit Princess hotel-serviced apartment and branded-residence development. Its residential format includes fully furnished units, hotel-oriented facilities, smart check-in and check-out, dining venues, spa and gym facilities, and scheduled shuttle services. The development also highlights an 8% assured rental offering, 14 complimentary stay days and participation in the Dusit Gold loyalty programme. These features sit alongside the project’s studio through three-bedroom unit selection and its Q4 2025 stated handover.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.