Developer: Danube Properties Development · Dubai Silicon Oasis
Oasiz 1 by Danube is a residential project by Danube Properties in Dubai Silicon Oasis, Dubai, with prices from AED 710 000, handover Q4 2027, construction 30.4% complete per the DLD registry, 410 units.
| Type | Units | Size, sq.ft |
|---|---|---|
| Studio | 165 | 379–381 |
| 1 Bedroom | 166 | 559–684 |
| 2 Bedroom | 69 | 768–995 |
| 3 Bedroom | 8 | 1 158–1 163 |
| NA | 2 | 995–1 921 |
Data from the Dubai Land Department registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Danube Properties · District: Dubai Silicon Oasis
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 21.07.2026 | 1 BR | 52.4 | 999 000 |
| 13.07.2026 | 178.5 | 5 359 590 | |
| 07.05.2026 | 2 BR | 38.5 | 668 745 |
| 01.05.2026 | Studio | 35.2 | 678 030 |
| 31.03.2026 | 1 BR | 52.1 | 1 049 999 |
| 30.01.2026 | 1 BR | 52.6 | 1 000 002 |
| 22.01.2026 | 1 BR | 26.3 | 490 000 |
| 30.12.2025 | Studio | 35.2 | 762 000 |
| 15.12.2025 | Studio | 35.4 | 804 000 |
| 08.12.2025 | Studio | 35.2 | 757 029 |
| 27.11.2025 | Studio | 35.2 | 771 000 |
| 27.11.2025 | Studio | 35.2 | 747 000 |
| 24.11.2025 | Studio | 35.4 | 793 360 |
| 12.11.2025 | 1 BR | 52.1 | 1 000 000 |
| 10.11.2025 | Studio | 35.2 | 781 000 |
| 14.10.2025 | Studio | 35.4 | 765 359 |
| 08.10.2025 | Studio | 35.4 | 852 000 |
| 08.10.2025 | Studio | 35.4 | 793 000 |
| 06.10.2025 | Studio | 35.4 | 801 000 |
| 30.09.2025 | 1 BR | 52.1 | 1 180 000 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +9% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 35 | 752 000 | 21 486 | 145 |
| 1 bedroom | 52 | 1 000 000 | 19 231 | 150 |
| 2 bedrooms | 71 | 1 355 000 | 19 085 | 49 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Oasiz 1 by Danube is a 410-unit mixed-use development by Danube Properties in Dubai Silicon Oasis. The project is active, with construction recorded at 30.36% completion. Handover is scheduled for Q4 2027.
Oasiz 1 by Danube is planned as one building with one basement level, a ground floor, four podium levels, 32 floors and a roof level. The building is designed with a concrete structure, blockwork, and internal and external finishes. Its recorded total area is 20,957.24 square metres. The development has 410 units and a project start date of 1 December 2024. Construction is active, and the latest recorded completion ratio is 30.36%. The scheduled project completion date is 30 November 2027, which falls in Q4 2027. The project is in Dubai Silicon Oasis, a mixed-use district with residential, office, industrial and commercial uses.
The residential collection includes studios and one-, two- and three-bedroom apartments. The apartments are designed with open layouts and large windows intended to bring natural light into the rooms. Interior planning focuses on detailed finishes across the unit types. This range gives buyers a choice between studio accommodation and larger homes with up to three bedrooms within the same development. Oasiz 1 by Danube forms part of Dubai Silicon Oasis, where apartments sit alongside townhouses, villas, office space, warehousing and manufacturing facilities. The district also includes a central man-made lake and running track as part of its community setting.
Planned facilities include a swimming pool with a pool deck, a gymnasium, landscaped gardens, a children’s play area and shared social spaces. The amenity offering also includes dining outlets, restaurants, retail outlets, a supermarket, parks and leisure areas, and a health care centre. Residents are also planned to have access to 24-hour security, concierge services and covered parking. These facilities combine recreation, fitness, family-oriented space and daily retail within the project’s offering. The development’s location in Dubai Silicon Oasis also places it in a district where green areas, pedestrian corridors, sports facilities and community infrastructure form part of ongoing development works.
Oasiz 1 by Danube is located in Dubai Silicon Oasis, a technology-focused free zone and mixed-use community positioned at the junction of Sheikh Mohammed Bin Zayed Road and Al Ain Road. The district combines business and residential uses, with offices, industrial facilities, apartments, townhouses and villas. Sheikh Mohammed Bin Zayed Road is 3 minutes away, while Silicon Central Mall is 2 minutes away. Dubai Silicon Oasis is adjacent to Academic City and has road links to other parts of Dubai. Its central lake and running track are established recreation features within the community, while road enhancement works have added internal connections, service roads and pedestrian corridors.
Silicon Towers Park is 0.6 km from Oasiz 1 by Danube. Liwan Playground is 1.3 km away, and Silicon Oasis Lake Park is 1.8 km away. IMG Worlds of Adventure is 6.4 km away, where Novo Cinema is also located. Global Village is 8.4 km away, while Ras Al Khor Wildlife Sanctuary is 9.0 km away. The Track Meydan Golf is 7.5 km from the project. Dubai Safari Park is 10 minutes away, and Dubai Creek Harbour and Dubai Design District are each 11 minutes away. Burj Khalifa and Dubai Mall are each 12 minutes away, while City Centre Mirdif is 13 minutes away.
The payment plan is structured as 65% during the pre-handover period and 35% after handover. A 10% down payment is due on booking. A further 54% is scheduled during construction through the first to 35th instalments, followed by 1% on handover at 100% completion. The remaining 35% is payable after handover within 35 months. The starting price is AED 710,000. This payment structure combines the booking payment, construction-linked instalments, a handover payment and a post-handover balance. The project’s scheduled completion date is 30 November 2027.
Danube Properties is the developer of Oasiz 1 by Danube. The project commenced on 1 December 2024 and is scheduled to complete on 30 November 2027. It is currently active, with a recorded completion ratio of 30.36%. The development is one mixed-use building comprising 410 units. Its construction format includes a basement, ground floor, four podium levels, 32 floors and a roof level. Oasiz 1 by Danube is located within Dubai Silicon Oasis, where Danube Properties is also developing a community mosque. The district is undergoing expansion through commercial, residential, hospitality, road, green-space and community-facility initiatives.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.