by Hesper Property Developers in International City 2
Linden Residences is a residential project by Hesper Property Developers in International City 2, Dubai, with handover 30.12.2027, construction 11.9% complete per the DLD registry.
Construction progress
- Handover30.12.2027
- Status date30.04.2026
- DLD project number3097
Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Hesper Property Developers · District: International City 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 12.06.2026 | 1 BR | 61.3 | 670 000 |
| 08.06.2026 | Studio | 42.9 | 237 703 |
| 23.04.2026 | Studio | 44.3 | 470 000 |
| 11.03.2026 | Studio | 42.9 | 480 000 |
| 06.03.2026 | Studio | 44.9 | 555 668 |
| 23.02.2026 | Studio | 40.2 | 497 248 |
| 19.02.2026 | 1 BR | 72.9 | 875 556 |
| 19.02.2026 | Studio | 42.9 | 520 178 |
| 19.02.2026 | Studio | 40.2 | 497 248 |
| 27.01.2026 | Studio | 31.2 | 420 000 |
| 02.01.2026 | Studio | 42.9 | 507 716 |
| 15.12.2025 | Studio | 39.0 | 450 000 |
| 26.11.2025 | Studio | 44.7 | 539 848 |
| 25.11.2025 | Studio | 40.2 | 482 331 |
| 29.10.2025 | Studio | 39.0 | 451 000 |
| 27.10.2025 | Studio | 39.0 | 475 871 |
| 24.10.2025 | Studio | 31.2 | 380 982 |
| 11.06.2018 | 2 500.0 | 3 550 000 | |
| 20.10.2010 | 2 500.0 | 1 480 100 |
Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →
Places nearby
About the project
Linden Residences is a 72-unit residential building in International City 2, within Warsan Fourth. Black Soil Real Estate Development is developing the project, which is active and recorded at 11.88% completion, with completion dated 30 December 2027.
The residential building
Linden Residences is planned as one residential building with 72 units. The building configuration is recorded as G+1P+5+R, comprising a ground level, one parking level, five upper levels and a roof level. It forms a single-building project rather than a multi-building development. The project started on 1 April 2024 and has a total recorded area of 5,540.58. Linden Residences is located in Warsan Fourth, in the district known as International City 2. Its project number is 3097.
Construction status and completion
Linden Residences is active. Its recorded completion ratio is 11.88%, based on an inspection dated 30 April 2026. The project completion date is 30 December 2027. Construction began on 1 April 2024. Buyers considering the development can therefore assess it as a project under construction, with work progressing toward its recorded completion date. The development contains 72 units in one building, allowing the construction status and expected completion date to be considered at the level of the full project rather than across separate phases or buildings.
International City 2 setting
International City 2 is a planned extension of International City in Dubai’s Warsan 4 area. The district covers 731 hectares and incorporates areas commonly known as Phase 2 and Phase 3. It is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. The masterplan includes a central high-rise circle surrounded by low- and mid-rise neighbourhoods. International City Phase 3 is associated primarily with mid-rise apartment buildings, while Phase 2, rebranded as Greenview, was redesigned for townhouses and villas.
Parks, attractions and leisure nearby
Silicon North Park is 2.1 km from Linden Residences, while Silicon Oasis Lake Park is 3.3 km away and Silicon Oasis Community Park is 4.1 km away. Novo Cinema at Dragon Mall is 3.1 km away. Dubai Safari Park is 6.4 km away, Yalla Bowling at City Centre Mirdif is 7.0 km away, and Ras Al Khor Wildlife Sanctuary is 8.0 km away. Al Badia Golf Club is 7.6 km from the project, while The Track Meydan Golf is 8.4 km away. Vox Cinemas at Mirdif City Centre is 7.2 km away.
District plan and transport context
International City 2 has a masterplan divided into five character zones: District Centre, The Ramblas, Residential Clusters, Open Space areas and International City Phase 3. The District Centre is planned as a mixed-use area with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings and ground-floor retail. Roads and pavements are substantially in place across the district, while public open spaces are being established through the staged masterplan. The nearest Red Line Dubai Metro station is 9,071 metres from International City 2. A Blue Line route and station are planned for the corridor between Phase 2 and Phase 3.
The developer
Black Soil Real Estate Development is the developer of Linden Residences. The company is developing the project as a 72-unit residential building in International City 2. Linden Residences is recorded under project number 3097 and consists of one building configured as G+1P+5+R. Construction started on 1 April 2024, and the project is active with a recorded completion ratio of 11.88%. The recorded project completion date is 30 December 2027. These details identify the development as a defined single-building residential project rather than a district-wide master development.