Developer: Meteora Real Estate Development · JVC District 17
7 Park Central is a residential project by Meteora Developers in JVC District 17, Dubai, with prices from AED 770 000, handover Q2 2024, construction 90.2% complete per the DLD registry, 121 units.
| Type | Size, sq.ft |
|---|---|
| 1 Bedroom | 635–947 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Meteora Developers · District: JVC District 17
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 04.08.2026 | 1 BR | 70.6 | 970 000 |
| 08.04.2026 | 1 BR | 57.2 | 890 000 |
| 29.01.2026 | 1 BR | 76.5 | 942 000 |
| 29.01.2026 | 1 BR | 71.4 | 900 000 |
| 16.06.2025 | 1 BR | 58.1 | 925 000 |
| 13.06.2025 | 1 BR | 71.4 | 960 000 |
| 05.05.2025 | 1 BR | 69.7 | 860 000 |
| 08.04.2025 | 1 BR | 57.8 | 807 872 |
| 03.03.2025 | 1 BR | 58.1 | 1 050 000 |
| 27.01.2025 | 1 BR | 57.1 | 900 000 |
| 11.12.2024 | 1 BR | 29.1 | 437 000 |
| 09.10.2024 | 1 BR | 57.1 | 790 312 |
| 09.08.2024 | 1 BR | 66.6 | 928 000 |
| 09.08.2024 | 1 BR | 57.1 | 841 000 |
| 14.05.2024 | 1 BR | 70.6 | 841 500 |
| 14.05.2024 | 1 BR | 70.4 | 835 000 |
| 14.05.2024 | 1 BR | 71.4 | 942 000 |
| 08.05.2024 | 1 BR | 67.2 | 865 000 |
| 30.04.2024 | 1 BR | 86.5 | 918 000 |
| 30.04.2024 | 1 BR | 57.8 | 918 000 |
Dubai Land Department transaction registry, updated 2026-08-19. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 67 | 865 000 | 12 910 | 128 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

7 Park Central is a residential and retail development in JVC District 17, within Jumeirah Village Circle. Meteora Developers is developing the 121-unit project, which is active and recorded at 90.18% completion following an inspection dated 14 February 2025. The project completion date is 30 April 2025.
7 Park Central comprises one building with a ground floor, mezzanine level, four parking levels, 15 floors and a roof level. Retail space is included at ground-floor level, alongside the residential component. The building is designed with a concrete structure, blockwork, and internal and external finishes. The project has 121 units in total. The residential offering is described as a collection of one-bedroom apartments with contemporary interiors and high-end finishes. The building format combines ground-floor retail with apartments across the upper levels, placing residential and commercial uses within the same development.
The available residential typology is one-bedroom apartments. These homes form part of a 121-unit scheme in JVC District 17. The development is described as a 19-storey residential project, while its registered building configuration includes a ground floor, mezzanine, four parking levels, 15 floors and a roof level. The project combines apartments with retail space at ground level. Starting prices are listed from AED 770,000. Buyers considering 7 Park Central can assess a one-bedroom apartment format within a project that includes a defined residential and retail structure.
Facilities listed for 7 Park Central include a swimming pool, gymnasium and fitness centre. The amenity programme also includes jogging trails, a sports court, tennis courts and a children’s play area. A multipurpose lounge is included for shared gatherings, alongside parks and leisure areas. Indoor parking and 24-hour security are listed within the development’s facilities. Dining outlets, restaurants and a supermarket are also included in the amenity listing, as are a health care centre and beach access. These facilities sit alongside the project’s residential and ground-floor retail components.
7 Park Central is located in JVC District 17, a residential sub-area within Jumeirah Village Circle. Markh Park is 0.1 km from the project, while Halool Park is 0.3 km away and Thamam Park is 0.5 km away. Cinepolis at Circle Mall is 0.7 km from 7 Park Central. Dubai Miracle Garden and The Els Golf Club are each 2.6 km away. Reel Cinemas at The Springs Souk is 2.7 km away, while Montgomerie Golf Course is 4.3 km from the project and Jumeirah Golf Estates Golf Course is 4.7 km away. The Storm Coaster is 5.2 km away, and Ski Dubai and Vox Cinemas at Mall of the Emirates are each 6.7 km from the project.
Circle Mall is listed at five minutes from 7 Park Central. Dubai Marina is listed at 10 minutes, Dubai Butterfly Garden at 15 minutes and Mall of the Emirates at 15 minutes. Downtown Dubai and Dubai International Airport are each listed at 20 minutes. Within the wider District 17 area, Nord Anglia International School Dubai is 1.0 km from the district and JSS International School is 1.4 km away. The nearest indicated Dubai Metro Red Line station, identified as R34, is 6,446 metres from the centre of District 17.
Prices at 7 Park Central start from AED 770,000. The payment plan begins with a 5% down payment on booking. A further 45% is due during construction across the first to fourth instalments. The plan allocates 10% on handover at 100% completion. The remaining 40% is payable post-handover within 40 months. The payment plan header states 1% monthly post-handover. This structure allocates 60% through booking, construction and handover stages, with the final 40% scheduled after handover.
Meteora Developers is the developer of 7 Park Central. The project started on 13 March 2023 and is active. Its completion ratio is 90.18%, based on an inspection dated 14 February 2025. The project completion date is 30 April 2025. The development is recorded as a single building containing 121 units, with residential and retail uses. Its building configuration includes a ground floor, mezzanine, four parking levels, 15 floors and a roof level. The construction specification identifies a concrete structure and blockwork, with internal and external finishes.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.