Developer: Tarrad Development · DubaiLand Residence Complex
Celesto Tower is a residential project by Tarrad Development in DubaiLand Residence Complex, Dubai, with prices from AED 567 000, handover Q4 2027, construction 3.9% complete per the DLD registry, 271 units.
| Type | Size, sq.ft |
|---|---|
| Studio | 350 |
| 1 Bedroom | 590 |
| 2 Bedroom | 927 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Tarrad Development · District: DubaiLand Residence Complex
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 11.08.2026 | Studio | 33.2 | 542 864 |
| 11.08.2026 | 1 BR | 66.1 | 981 225 |
| 05.08.2026 | 1 BR | 57.2 | 803 183 |
| 05.08.2026 | 1 BR | 57.1 | 743 404 |
| 04.08.2026 | 1 BR | 67.9 | 834 730 |
| 04.08.2026 | 1 BR | 57.2 | 842 688 |
| 29.07.2026 | Studio | 33.1 | 542 435 |
| 27.07.2026 | 1 BR | 77.8 | 938 636 |
| 27.07.2026 | Studio | 33.1 | 531 476 |
| 27.07.2026 | Studio | 37.4 | 577 000 |
| 22.07.2026 | Studio | 48.2 | 646 000 |
| 21.07.2026 | Studio | 39.6 | 650 199 |
| 13.07.2026 | 1 BR | 69.9 | 985 492 |
| 07.07.2026 | Studio | 34.0 | 527 315 |
| 07.07.2026 | 2 BR | 86.4 | 1 179 425 |
| 22.06.2026 | 1 BR | 63.3 | 901 443 |
| 22.06.2026 | Studio | 48.2 | 680 000 |
| 19.06.2026 | 1 BR | 57.7 | 783 792 |
| 19.06.2026 | Studio | 34.0 | 565 440 |
| 15.06.2026 | Studio | 34.0 | 550 000 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 36 | 576 056 | 16 002 | 93 |
| 1 bedroom | 58 | 825 044 | 14 225 | 47 |
| 2 bedrooms | 86 | 1 179 425 | 13 714 | 9 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Celesto Tower is a one-building residential development by Tarrad Development in DubaiLand Residence Complex, within Wadi Al Safa 5. It comprises 271 homes across a basement, ground floor, three podium levels, 13 residential floors and a rooftop. The project is active, with construction recorded at 3.89% completion and handover scheduled for Q4 2027.
Celesto Tower is configured as a residential building with a basement, ground floor, three podium levels, 13 residential floors and a rooftop level. The project has a total recorded area of 12,754.98. Its exterior design incorporates modern lines, curved surfaces and transparent glass used on windows and balcony railings. Spacious balconies are included in the design, with greenery forming part of the proposed building character. The tower is planned as a single building in DubaiLand Residence Complex, a residential community within the wider DubaiLand area. Its 271-unit scale combines homes and shared components within the same vertical building arrangement.
The residence includes studios, one-bedroom apartments and two-bedroom apartments. Homes are described as fully furnished and designed with smart-home features. The layouts follow an open-concept arrangement, combining living, dining and kitchen spaces. Living rooms include large windows, while bedrooms have direct balcony access. Interior palettes are described as elegant and neutral, with the layout intended to connect indoor rooms with the balcony areas. The apartment selection spans three home types, allowing buyers to consider a studio, one-bedroom or two-bedroom configuration within the same building and location.
Shared areas are planned across the podium levels and the rooftop. The building structure places the three podium levels between the ground level and the 13 residential floors, while the rooftop forms the uppermost shared component of the development. Greenery is incorporated into the design of the spacious balconies, and the podium and rooftop are identified as common areas within the tower. These levels sit alongside the residential accommodation rather than forming separate buildings, as Celesto Tower is registered as one building.
Celesto Tower is located in DubaiLand Residence Complex, within Wadi Al Safa 5 and north-west of central Dubai. The community contains multiple residential buildings, construction plots, parks and street infrastructure. Community-scale green areas are distributed through the neighbourhood, including landscaped roundabouts and junctions. The Aquila School is recorded 0.4 km away, while GEMS FirstPoint School is 0.6 km away. DubaiLand Residence Complex forms part of the wider DubaiLand cluster and includes residential projects at different stages of development. Road connections are the principal transport option for the community.
Several green spaces are close to Celesto Tower. DLRC North Park is 0.2 km away, DRC Mixed Use West Park is 0.3 km away and DRC Central Community Hub is 0.5 km away. IMG Worlds of Adventure is 6.1 km from the tower, while Global Village is 7.8 km away and Ras Al Khor Wildlife Sanctuary is 11.6 km away. The Track Meydan Golf is 9.8 km away, and Dubai Hills Golf Club is 11.7 km away. Novo Cinema at IMG Worlds of Adventure is 6.1 km from the project, while Novo Cinema at Dragon Mall is 9.4 km away.
Prices at Celesto Tower start from AED 567,000. The payment plan is structured as 50/50: 20% is due on booking, 30% is payable during construction at 1% monthly, and the remaining 50% is due on handover. Construction started on 1 November 2025. The project is active and its recorded completion ratio is 3.89%. The scheduled completion date is 31 December 2027, corresponding with the stated Q4 2027 handover. The development contains 271 units, matching the registered total for the project.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.