Gallery

On map

Verdania 2 is a residential project by Object 1 Development in DubaiLand Residence Complex, Dubai, with handover 30.03.2027, construction 9% complete per the DLD registry.

Construction9%

Construction progress

9.01%
  • Handover30.03.2027
  • Status date18.06.2026
  • DLD project number3576

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 15
18 June 2026 9.01%
Verdania 2, DubaiLand Residence Complex construction progress — 18 June 2026, 9.01% complete, photo 1 of 3Verdania 2, DubaiLand Residence Complex construction progress — 18 June 2026, 9.01% complete, photo 2 of 3Verdania 2, DubaiLand Residence Complex construction progress — 18 June 2026, 9.01% complete, photo 3 of 3

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
21.04.20261 BR72.61 083 953
07.04.20261 BR70.11 161 175
31.03.20261 BR72.61 072 748
17.02.2026Studio42.6681 011
02.01.20261 BR72.61 045 363
16.12.20252 BR110.31 576 609
08.12.20251 BR70.01 124 579
03.12.20251 BR70.01 007 567
21.11.20251 BR70.01 057 104
21.11.20251 BR69.81 100 121
21.11.20251 BR72.61 115 198
12.11.20251 BR72.81 094 329
10.11.20251 BR69.81 034 630
04.11.20251 BR70.1925 489
30.10.2025Studio42.6686 715
21.10.20253 BR179.72 880 000
21.10.20251 BR70.11 071 557
14.10.20251 BR70.1989 316
24.09.20251 BR70.11 021 230
12.09.20251 BR69.81 034 901

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

About the project

Verdania 2 is a single residential building by Obj1 Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The development is configured as B+G+11+R and contains 108 units. It is active, with 9.01% completion recorded on 18 June 2026 and a completion date of 30 March 2027.

The project

Verdania 2 is planned as one residential building with a basement, ground floor, 11 upper floors and a roof level. The project contains 108 units within a recorded total area of 8,666.09. Construction started on 4 June 2025. The project is located in DubaiLand Residence Complex, a residential community in the wider DubaiLand area and within the Wadi Al Safa 5 sub-area. DubaiLand Residence Complex includes multiple residential buildings and newer development plots, together with landscaped roads, pavements and roundabouts.

Construction progress and completion

Verdania 2 has active status. Its completion ratio was 9.01% at the inspection dated 18 June 2026. The planned project completion date is 30 March 2027. The development started on 4 June 2025 and is being delivered as a single building. The current project configuration is B+G+11+R, comprising a basement, ground floor, 11 floors and a roof level. The total unit count is 108.

DubaiLand Residence Complex setting

DubaiLand Residence Complex is a planned residential development within Wadi Al Safa 5, north-west of central Dubai. The community combines mid-rise residential projects, community green areas and basic street infrastructure. Landscaped roundabouts and junctions contribute to the public realm across the development. The area has two mid-sized parks in each half of the complex, as well as smaller peripheral parks. These parks include sports facilities and children’s play areas. Main junction and streetscape improvements in the community are complete or in their final stages.

Schools, parks and community facilities

The Aquila School is 0.4 km from DubaiLand Residence Complex, while GEMS FirstPoint School is 0.6 km away. Parks and sports areas are distributed through the community’s central and peripheral areas. The two mid-sized parks in each half of the complex are supplemented by smaller parks on the edges of the development, with play areas and sports facilities. Within the community, on-street parking is fully allocated. Where applicable, street parking is charged at AED 3 per hour.

Connections to Dubai destinations

Global Village is 7.6 km from DubaiLand Residence Complex. The Dubai Mall is 15.4 km away, while Business Bay is 15.5 km away. Burj Khalifa and Downtown Dubai are 15.7 km from the community, and DIFC is 16.5 km away. Dubai International Airport is 18.0 km away and Mall of the Emirates is 18.1 km away. Dubai Marina is 24.0 km from the community. Road connections are the main travel mode from the immediate area.

Developer

Obj1 Real Estate Development is the developer of Verdania 2. The company is delivering the project in DubaiLand Residence Complex, within Wadi Al Safa 5. Verdania 2 is a 108-unit residential development arranged in one B+G+11+R building. The project commenced on 4 June 2025, has active status, and carries a scheduled completion date of 30 March 2027. Its recorded completion ratio was 9.01% on 18 June 2026.

FAQ

Who is the developer of Verdania 2?
Verdania 2 is being developed by Obj1 Real Estate Development.
Where is Verdania 2 located?
Verdania 2 is in DubaiLand Residence Complex, within Wadi Al Safa 5 in the wider DubaiLand area.
How many units are in Verdania 2?
Verdania 2 contains 108 units in one residential building.
What is the building configuration of Verdania 2?
The development is configured as B+G+11+R, with a basement, ground floor, 11 upper floors and a roof level.
When is Verdania 2 scheduled for completion?
The scheduled completion date is 30 March 2027.
What is the construction status of Verdania 2?
Verdania 2 is active. Its completion ratio was 9.01% at the inspection dated 18 June 2026.
What is near Verdania 2?
The Aquila School is 0.4 km away and GEMS FirstPoint School is 0.6 km away. Global Village is 7.6 km from DubaiLand Residence Complex.
How far is Downtown Dubai from Verdania 2?
Burj Khalifa and Downtown Dubai are 15.7 km from DubaiLand Residence Complex.
How can I buy an apartment in Verdania 2?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request