by M V S Real Estate Development in Dubai Islands
Sea Legend One By Mvs Real Estate is a residential project by M V S Real Estate Development in Dubai Islands, Dubai, with handover 30.11.2026, construction 22.2% complete per the DLD registry.
Construction progress
- Handover30.11.2026
- Status date04.08.2026
- DLD project number3265
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: M V S Real Estate Development · District: Dubai Islands
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 28.07.2026 | 1 BR | 76.0 | 2 155 000 |
| 09.07.2026 | 1 BR | 76.0 | 2 307 215 |
| 22.06.2026 | 2 BR | 106.9 | 2 647 415 |
| 06.04.2026 | 3 BR | 142.4 | 3 526 475 |
| 06.04.2026 | 3 BR | 151.3 | 3 745 297 |
| 06.04.2026 | 3 BR | 142.2 | 3 520 104 |
| 02.04.2026 | 3 BR | 142.4 | 3 426 125 |
| 02.04.2026 | 3 BR | 148.7 | 3 682 300 |
| 02.04.2026 | 3 BR | 148.7 | 3 680 230 |
| 01.04.2026 | 1 BR | 76.0 | 2 282 822 |
| 18.03.2026 | 3 BR | 151.3 | 3 646 372 |
| 17.02.2026 | 2 BR | 129.4 | 3 170 120 |
| 09.12.2025 | 1 BR | 76.0 | 2 340 530 |
| 05.12.2025 | 2 BR | 107.5 | 2 400 377 |
| 04.12.2025 | 1 BR | 76.0 | 1 724 013 |
| 04.12.2025 | 2 BR | 131.5 | 3 250 926 |
| 20.10.2025 | 2 BR | 106.9 | 2 866 059 |
| 20.10.2025 | 3 BR | 142.2 | 3 476 563 |
| 16.10.2025 | 1 BR | 70.8 | 2 003 489 |
| 15.10.2025 | 2 BR | 107.5 | 2 366 642 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Sea Legend One By Mvs Real Estate is a 65-unit residential building by M V S Real Estate Development on Dubai Islands. The project is Active, with a reported completion ratio of 22.20% at the inspection dated 4 August 2026. Completion is scheduled for 30 November 2026.
The project and building configuration
Sea Legend One is planned as one residential building on Dubai Islands. Its configuration comprises a ground level, two podium levels, 11 typical floors and a roof level. The roof is designated for a pool and health club. The project has a total of 65 homes within a recorded total area of 8,967.50. The development began on 21 September 2023 and is scheduled for completion on 30 November 2026. M V S Real Estate Development is the project developer.
Apartment and penthouse mix
The 65 residences comprise 11 one-bedroom apartments, 33 two-bedroom apartments, 20 three-bedroom apartments and one penthouse. Two-bedroom homes form the largest part of the residential mix, accounting for 33 of the 65 units. The project includes one building rather than multiple residential blocks, placing its full apartment and penthouse collection within the same G+2P+11-floor structure. The roof level includes the project’s pool and health club.
Roof-level facilities
Sea Legend One includes a roof-level pool and health club. These facilities are incorporated into the building’s roof level above the 11 typical residential floors. The overall layout also includes a ground level and two podium levels beneath the residential levels. The project is a residential building with 65 homes, comprising one-, two- and three-bedroom apartments alongside a single penthouse.
Construction progress and completion date
The project is Active. Its completion ratio was reported at 22.20% following the inspection dated 4 August 2026. The scheduled completion date is 30 November 2026, while the recorded project start date is 21 September 2023. Sea Legend One has project number 3265 and consists of one building with 65 residential units. Its planned unit mix includes 11 one-bedroom apartments, 33 two-bedroom apartments, 20 three-bedroom apartments and one penthouse.
Dubai Islands setting
Sea Legend One is located on Dubai Islands, a five-island waterfront masterplan on Dubai’s northern coastline. The islands are Marina Island, Central Island, Shore Island, Golf Island and Elite Island. The wider masterplan combines residential projects with hotels, resorts, public beaches, parks and a marina network. It includes 37 hotels and resorts, while the RIU and Centara resorts are already open. Dubai Islands also provides for two square kilometres of parks and open areas. Central Island is planned around Deira Mall and The Night Market, while Golf Island includes an 18-hole golf course and wellness enclaves.
Marina, beaches and transport connections
Nakheel Marinas Dubai Islands launched in May 2023. The marina has 248 wet berths for vessels up to 47 metres, 40 dry berths for trailers up to 20 metres, and capacity for up to 13 superyachts at one time. Dubai Islands includes public beaches, including Blue Flag-designated beaches. Dubai International Airport is 9.6 km away by road, while Downtown Dubai is 13.8 km away and DIFC is 12.1 km away. The nearest Dubai Metro access is Green Line station G22, 4.7 km from Dubai Islands. New bridge links form part of planned and ongoing road infrastructure works.












