by Gulf Global Group in The Palmarosa
Palmarosa is a residential project by Gulf Global Group in The Palmarosa, Dubai, with handover 31.10.2022, construction 97.8% complete per the DLD registry.
Construction progress
- Handover31.10.2022
- Status date08.01.2026
- DLD project number158
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Gulf Global Group · District: The Palmarosa
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 04.02.2026 | 4 BR | 323.3 | 3 500 000 |
| 17.11.2025 | 343.7 | 2 000 000 | |
| 16.09.2025 | 296.8 | 4 138 574 | |
| 22.05.2025 | 588.1 | 3 910 000 | |
| 26.02.2025 | 735.0 | 5 500 000 | |
| 02.01.2025 | 290.7 | 3 900 001 | |
| 25.12.2024 | 277.8 | 3 400 000 | |
| 19.11.2024 | 301.6 | 3 659 040 | |
| 15.10.2024 | 393.9 | 2 950 000 | |
| 22.04.2024 | 296.0 | 2 314 049 | |
| 05.03.2024 | 453.7 | 3 000 000 | |
| 13.12.2023 | 665.7 | 3 000 000 | |
| 13.12.2023 | 393.9 | 3 000 000 | |
| 13.12.2023 | 498.0 | 3 000 000 | |
| 10.07.2023 | 510.1 | 3 461 415 | |
| 05.04.2022 | 393.9 | 3 402 000 | |
| 23.02.2021 | 510.1 | 2 900 000 | |
| 11.01.2021 | 439.4 | 2 443 075 | |
| 11.01.2021 | 390.5 | 2 098 527 | |
| 11.01.2021 | 472.9 | 2 098 527 |
Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →
Places nearby
About the project
Palmarosa is a low-rise residential development of villas and townhouses in The Palmarosa, Wadi Al Safa 7 within Dubai Land. It is being developed by Gulf Developers Fzc and has 315 total units across a recorded total area of 255,883.48 square metres. The project is active, with a completion ratio of 97.79% recorded on 8 January 2026.
Project scale and current status
Palmarosa carries project number 158 and started on 9 October 2008. Its stated completion date is 31 October 2022, while its current status remains active. The latest recorded completion ratio is 97.79%, based on an inspection dated 8 January 2026. The development has 315 total units and a total recorded area of 255,883.48 square metres. The residential component is arranged in a low-rise format, with villas and townhouses forming the principal home types. Community infrastructure, clubhouses and a community facility building are included within the project description.
Homes and phased masterplan
The Palmarosa masterplan is divided into two phases. Phase 1 comprises 192 villas and townhouses. These homes are described as low-rise residences, with villas designed as ground-plus-one-storey buildings. Phase 2 comprises 93 townhouses, together with a hotel building and a mixed-use building. Across the two phases, the development combines standalone and cluster housing formats. The wider plan also includes commercial space and a spa within the mixed-use component. This creates a residential-led project with hospitality, commercial and community elements within the same Wadi Al Safa 7 setting.
Landscaping and community facilities
Landscaped plots form part of the development’s layout. The project description includes clubhouses, a community facility building and infrastructure alongside the residential villas. The second phase adds a hotel building and a mixed-use building with commercial space and a spa. Palmarosa is therefore configured around low-rise residential accommodation rather than high-rise buildings, with shared community and mixed-use elements included in the overall plan. The development sits within The Palmarosa, a planned residential subcommunity in Dubai Land’s Wadi Al Safa 7 area.
Wadi Al Safa 7 and Dubai Land setting
Palmarosa is located in The Palmarosa, Wadi Al Safa 7, within Dubai Land. Global Village is listed 7.6 km from the development. Downtown Dubai is listed at 16.0 km, while Dubai Mall is 15.7 km away and Business Bay is 15.8 km away. Dubai International Financial Centre is listed at 16.8 km. Mall of the Emirates and Dubai International Airport are each listed at 18.3 km. Palm Jumeirah is 24.4 km away, Dubai Marina is 24.1 km away and JBR Beach is listed at 24.9 km. Al Maktoum International Airport is 30.7 km from the development.
Schools and nearby destinations
GEMS Metropole School Al Waha is listed 0.9 km from The Palmarosa. Ranches Primary School is listed 1.4 km away. Global Village is 7.6 km from the development, placing a major leisure destination within the surrounding Dubai Land area. The nearest listed metro reference is Green Line station G30, at a recorded distance of 14,864 metres. Within Palmarosa itself, the planned hotel, commercial space and spa are part of the later mixed-use component, alongside the development’s residential and community facilities.
Developer
Gulf Developers Fzc is the developer of Palmarosa. The company is associated with the project’s 315-unit development in Wadi Al Safa 7, Dubai Land. Palmarosa began on 9 October 2008 and has a stated completion date of 31 October 2022. The project remains active and had reached a 97.79% completion ratio at the inspection recorded on 8 January 2026. Its development plan includes villas, townhouses, clubhouses, community facilities, infrastructure, a hotel building and a mixed-use building with commercial space and a spa.



