by Dubai Investments in Meydan Horizon
Al Vista is a residential project by Dubai Investments in Meydan Horizon, Dubai, with handover 20.10.2027, construction 5.5% complete per the DLD registry.
Construction progress
- Handover20.10.2027
- Status date01.07.2026
- DLD project number3802
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.07.2026 | 172.3 | 5 481 089 | |
| 21.07.2026 | 2 BR | 123.5 | 3 257 936 |
| 12.06.2026 | 111.2 | 3 327 009 | |
| 12.06.2026 | 172.8 | 5 172 150 | |
| 12.06.2026 | 111.2 | 3 536 361 | |
| 11.06.2026 | 109.3 | 3 198 466 | |
| 11.06.2026 | 111.2 | 3 327 009 | |
| 11.06.2026 | 1 BR | 73.3 | 1 735 316 |
| 11.06.2026 | 1 BR | 67.1 | 1 624 590 |
| 11.06.2026 | 667.6 | 16 563 174 | |
| 11.06.2026 | 172.3 | 5 481 089 | |
| 11.06.2026 | 172.3 | 5 481 089 | |
| 11.06.2026 | 109.3 | 3 476 581 | |
| 11.06.2026 | 172.3 | 5 042 605 | |
| 11.06.2026 | 667.6 | 16 563 174 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
About the project
Al Vista is a two-tower development by Dubai Investments in Meydan Horizon, within the Meydan and Bu Kadra sector of Mohammed Bin Rashid City. The scheme combines a residential Tower A with an office Tower B over a shared ground level and four podiums. It is active, with a reported construction completion ratio of 5.50% and a scheduled completion date of 20 October 2027.
A two-tower development
Al Vista is planned as two buildings arranged above a common ground floor and four podium levels. Tower A is the residential component, configured as ground floor, 39 floors, a mechanical level and a roof. Tower B is designated for offices and is configured as ground floor, 18 floors and a roof. The development covers a total area of 48,460.34. This mixed-use arrangement places residential and office uses within the same project while retaining separate towers for each use. The project is located in the Bukadra area and is associated with Meydan Horizon, a named community in the broader Mohammed Bin Rashid City framework.
Construction status and scheduled completion
Al Vista has active project status. Construction began on 20 October 2025, and the recorded completion ratio is 5.50%, based on the inspection dated 1 July 2026. The scheduled project completion date is 20 October 2027. Buyers considering the project can therefore assess it as an early-stage development rather than a completed building. The current project configuration comprises the shared podium structure, a 39-floor residential tower with a mechanical level, and an 18-floor office tower. Completion remains scheduled for October 2027.
Meydan Horizon setting
Al Vista is in Meydan Horizon, a community within Mohammed Bin Rashid City associated with the Meydan and Bu Kadra locality. Meydan Horizon is presented as a planned residential neighbourhood containing several individual developments, rather than a single uniform project. Al Vista’s registered area is Bukadra, placing it within this wider Meydan Horizon setting. The community’s position within Mohammed Bin Rashid City gives the project a location in an established Dubai development zone that includes residential schemes and education providers. North London Collegiate School Dubai is cited at 1.8 km from Meydan Horizon, while Hartland International School is cited at 2.1 km.
Nearby parks, wildlife and leisure destinations
Several outdoor and leisure destinations are identified close to Al Vista. Hartland Greens East Park is 1.0 km away, Riviera East Park is 1.2 km away, and Sobha Hartland Estates Park is 1.3 km away. Ras Al Khor Wildlife Sanctuary is 1.2 km from the project. For golf, The Track Meydan Golf is 2.1 km away; Al Badia Golf Club is 5.8 km away, and Dubai Creek Golf & Yacht Club is 7.4 km away. Cinema options listed nearby include the Paramount Screening Room at Damac Towers by Paramount at 3.1 km, Cinema City at Address Dubai Mall at 4.3 km, and Reel Cinemas at Rove Downtown at 5.0 km.
Residential and office uses
The residential element of Al Vista is concentrated in Tower A, which rises from the common ground and podium structure through 39 floors, followed by a mechanical level and roof. Tower B is allocated to offices and rises through 18 floors above the ground level, with a roof level. The shared ground floor and four podiums form the base of both towers. This distinction between a residential tower and an office tower is part of the registered project description. The development is recorded as having two buildings, with its residential and office components identified separately in the project structure.
Dubai Investments
Dubai Investments is the developer of Al Vista. The company is associated with the project’s residential and office tower plan in Meydan Horizon. Al Vista is a current development within Dubai Investments’ portfolio, with construction having commenced in October 2025 and completion scheduled for October 2027. The developer name attached to the project is Dubai Investment Real Estate (L L C), while Dubai Investments is the name used for the developer.