by Mr Eight Development in Dubai Islands
Villa Del Brunello is a residential project by Mr Eight Development in Dubai Islands, Dubai, with prices from AED 5 150 000, handover Q4 2027, construction 2.2% complete per the DLD registry, 49 units.
Layouts and sizes
| Type | Size, sq.ft |
|---|---|
| 2 Bedroom | 1 082 |
| 3 Bedroom | 1 867 |
| 4 Bedroom | 2 485 |
| 2 Bedroom | |
| 3 Bedroom | |
| 4 Bedroom |
Payment plan 35/65
- Down payment20%
- During construction15%
- On handover65%
Construction progress
- StatusActive
- Construction started2025-11-30
- HandoverQ4 2027
- Status date16.06.2026
- Escrow bankBank of Sharjah
- DLD project number4011
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Mr Eight Development · District: Dubai Islands
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 06.08.2026 | 4 BR | 234.8 | 10 689 000 |
| 22.05.2026 | 3 BR | 187.0 | 8 501 000 |
| 23.03.2026 | 3 BR | 186.3 | 8 282 000 |
| 04.02.2026 | 2 BR | 125.2 | 5 350 000 |
| 18.12.2025 | 4 BR | 298.6 | 13 346 190 |
| 05.12.2025 | 2 BR | 102.6 | 5 600 000 |
| 05.12.2025 | 2 BR | 127.3 | 6 000 000 |
| 28.11.2025 | 2 BR | 101.7 | 5 400 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
Amenities
- Landscaped Gardens
- Gymnasium
- Restaurants
- Indoor Swimming Pool
- CCTV Security
- Barbecue Area
- Children's Play Area
Places nearby
About the project
Villa Del Brunello is a 49-unit residential development by Mr Eight Development on Dubai Islands. The project is active, with construction completion recorded at 2.23%, and its completion date is 30 November 2027, which falls in Q4 2027.
The development
Villa Del Brunello is planned as one residential building with a ground floor, two podium levels and 12 residential floors. The building includes a swimming pool, an outdoor area and a seating area on the first floor. It forms part of Dubai Islands, a waterfront masterplan on Dubai’s northern coastline. The development has 49 units in a single building, giving the project a defined residential scale. Construction commenced on 30 November 2025, and the scheduled completion date is 30 November 2027. Its current project status is active, with a recorded completion ratio of 2.23%.
Homes at Villa Del Brunello
The residence collection at Villa Del Brunello includes two-bedroom, three-bedroom and four-bedroom apartments, alongside duplexes. The project comprises 49 homes in total. The apartment and duplex mix provides several residential formats within the same building, while the building’s ground floor, two podium levels and 12 residential floors establish its vertical layout. Villa Del Brunello is located on Dubai Islands, where the wider masterplan combines residential, hospitality, marina and public-realm components. The scheduled completion date is 30 November 2027, placing handover in Q4 2027.
Pool and first-floor outdoor spaces
Villa Del Brunello includes a swimming pool as part of the building. The first floor is designated for an outside area and a seating area, creating shared outdoor space within the development. These facilities are incorporated into a residential building configured as ground floor, two podium levels and 12 floors above. The project contains 49 units, comprising two-bedroom, three-bedroom and four-bedroom apartments as well as duplexes. Villa Del Brunello is situated on Dubai Islands, a five-island masterplan that includes Marina Island, Central Island, Shore Island, Golf Island and Elite Island.
Dubai Islands setting
Villa Del Brunello is located on Dubai Islands, a masterplan on Dubai’s northern coastline. Dubai Islands comprises Marina Island, Central Island, Shore Island, Golf Island and Elite Island. The masterplan combines residential, hospitality, marina and public-realm components. Central Island is designed around Deira Mall and The Night Market, while Shore Island is planned for sports and resort uses. Golf Island includes an 18-hole golf course and wellness enclaves, and Elite Island is earmarked for luxury waterfront villas. Nakheel Marinas Dubai Islands forms part of the area’s marina infrastructure, with wet and dry berths for vessels and trailers.
Nearby beaches, attractions and leisure
Dubai Islands Beach is 0.3 km from Villa Del Brunello. Dubai Heritage Village is 3.7 km away, Dubai Museum is 4.0 km away and Queen Elizabeth 2 is 4.4 km away. Maritime City Park is 4.2 km from the project, while Al Mamzar Beach Park is 5.7 km away. Dubai Creek Golf & Yacht Club is 7.3 km away. For cinema access, Vox Cinema at City Centre Shindagh is 4.1 km from Villa Del Brunello, Vox Cinemas at BurJuman Mall is 5.1 km away, and Vox Cinemas at Deira City Centre is 6.4 km away.
Price, payment plan and completion
Prices for Villa Del Brunello start from AED 5,150,000. The payment plan is structured as 35% before handover and 65% on handover. The pre-handover portion comprises a 20% down payment on booking and 15% payable during construction across the first to third instalments. The remaining 65% is due on handover at 100% completion. Construction began on 30 November 2025. The completion date is 30 November 2027, corresponding with Q4 2027. The project is active and has a recorded completion ratio of 2.23%.
Mr Eight Development
Villa Del Brunello is developed by Mr Eight Development. Mr Eight Development was founded in 2024. The company is responsible for a 49-unit residential building on Dubai Islands, comprising two-bedroom, three-bedroom and four-bedroom apartments as well as duplexes. The project is configured as a ground-floor building with two podium levels and 12 residential floors. Its facilities include a swimming pool, an outdoor area and a seating area on the first floor. Construction for Villa Del Brunello began on 30 November 2025, with completion scheduled for 30 November 2027.









































