by Me Do Re Properties Dmcc in Jumeirah Lakes Towers
Me Do Re Business is a residential project by Me Do Re Properties Dmcc in Jumeirah Lakes Towers, Dubai, with handover 20.09.2029, construction 24.5% complete per the DLD registry.
Construction progress
- Handover20.09.2029
- Status date21.11.2024
- DLD project number3409
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Me Do Re Business is a single-building commercial tower development by Me Do Re Properties Dmcc in Jumeirah Lakes Towers. The project is active, with a recorded completion ratio of 24.47% following an inspection dated 21 November 2024. It is scheduled for project completion on 20 September 2029.
A commercial tower in Jumeirah Lakes Towers
Me Do Re Business is planned as a commercial tower on Plot H1 3930899 in Jumeirah Lakes Towers. The development comprises one building with 293 units. Its planned vertical configuration includes four basement levels, one upper-basement level, a ground floor, 39 floors, one mechanical floor, a roof and an upper roof. The structure is designed in concrete and incorporates an external curtain-wall glazing system. This configuration places the project within JLT’s established concentration of high-rise commercial and residential buildings arranged around lakeside public spaces.
Commercial units and delivery format
The project contains 293 commercial units within its single tower. Units are intended for handover in core-and-shell condition. The building’s commercial designation distinguishes Me Do Re Business from JLT’s residential towers and serviced-residence developments. The planned building includes dedicated basement and upper-basement levels below the ground floor and the 39-floor tower element above it. A mechanical floor, roof and upper roof form part of the approved building configuration. The total project area is recorded as 39,639.12.
The JLT district setting
Jumeirah Lakes Towers is a mixed-use waterfront district immediately behind Dubai Marina. It combines residential towers, commercial premises, hotels, retail and landscaped public spaces around three artificial lakes and a central park. The district comprises 87 tower blocks across 23 clusters, with high-rise buildings forming its predominant urban character. Lakeside promenades and the central park provide walking, jogging and cycling routes, while ground-floor retail, dining and office uses contribute to daily activity across the district. JLT is also home to the Dubai Multi Commodities Centre free zone, which has more than 21,000 companies across a range of sectors.
Transport and surrounding connections
Jumeirah Lakes Towers is served by the Dubai Metro Red Line, with station R36 identified as the nearest metro station. Pedestrian promenades and local roads connect the district with Dubai Marina and other nearby areas. The district’s waterfront layout centres on its three lakes and central park, and its tower clusters contain a combination of office, residential, hotel and retail premises. Dubai Marina is listed among the nearby destinations from JLT, alongside Palm Jumeirah, JBR Beach, Mall of the Emirates, Downtown Dubai, Business Bay, Expo City Dubai and Dubai International Airport.
Construction status and scheduled completion
Me Do Re Business holds active project status. Its recorded completion ratio is 24.47%, based on an inspection conducted on 21 November 2024. The recorded project start date is 15 November 2025, and the scheduled project completion date is 20 September 2029. The project is registered as a one-building development with 293 units. The scheduled completion date applies to the overall commercial tower project, whose units are intended to be delivered in core-and-shell condition.
Developer and master-planned district
Me Do Re Properties Dmcc is the developer of Me Do Re Business. The project is located within Jumeirah Lakes Towers, where Dubai Multi Commodities Centre is the master developer. JLT was established in 2002 and has developed as a high-density district of towers arranged along lakeside promenades. District public-realm works include lake and lake-wall improvements, water-quality works, landscape enhancements, road connections with Jumeirah Islands and expanded visitor parking. Recreational-facility upgrades and new sports infrastructure have also been announced for the wider district.
