by Harbour One Investment in Dubai Marina
Dubai Harbour Residences (Area 3) is a residential project by Harbour One Investment in Dubai Marina, Dubai, with handover 14.01.2028, construction 20% complete per the DLD registry.
Construction progress
- Handover14.01.2028
- Status date17.04.2026
- DLD project number3134
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Dubai Harbour Residences (Area 3) is a residential and commercial development by Harbour One Investment in Dubai Marina. The single-building project has 159 units, is active, and recorded 20.04% completion at its 17 April 2026 inspection.
The project at a glance
Dubai Harbour Residences (Area 3) is planned as one residential and commercial building in Dubai Marina. The building configuration is recorded as 2B+G+8, with two basement levels, a ground level and eight further levels. It includes ground-floor retail and public prayer facilities. The development has a total area of 35,021.20 and contains 159 units. Its project start date is 7 February 2025, and its recorded completion date is 14 January 2028. The project is classified as active.
Construction progress and completion
Construction for Dubai Harbour Residences (Area 3) started on 7 February 2025. The project was 20.04% complete at the inspection dated 17 April 2026. Its status is active, and the recorded project completion date is 14 January 2028. The development is registered under project number 3134. These details identify a project that is under construction within Dubai Marina, with its completion date set in January 2028.
Building scale and uses
The development comprises a single building with 159 units. Its registered description combines residential and commercial uses within a 2B+G+8 configuration. Retail is included at ground-floor level, while public prayer facilities form part of the building description. The project’s total recorded area is 35,021.20. Dubai Harbour Residences (Area 3) is therefore structured as a mixed-use building rather than a residential-only tower, combining its residential units with retail at ground level.
Dubai Marina setting
Dubai Harbour Residences (Area 3) is located in Dubai Marina, a waterfront district built around an artificial marina extending more than three kilometres. Dubai Marina sits along a man-made canal linked to the Arabian Gulf and forms part of Dubai’s wider coastal development zone. The district is characterised by high-rise residential buildings, a landscaped waterfront promenade and ground-floor hospitality and retail along marina-side routes. The promenade provides public access along the water’s edge and is used for walking, jogging, cycling and leisure. Restaurants and cafés are concentrated around the waterfront and quay areas, while the district’s urban setting includes residential towers facing the marina and inner streets.
Transport and nearby destinations
Dubai Marina is served by the Dubai Metro Red Line. Metro station R36 is 723 metres from the central marina area and is pedestrian-accessible. JBR Beach is 0.7 km from the central marina, while Palm Jumeirah is 3.8 km away. Mall of the Emirates is 7.5 km away, Expo City Dubai is 13.2 km away and Business Bay is 17.3 km away. Downtown Dubai and Burj Khalifa are 18.9 km away, while The Dubai Mall is 19.3 km away. Dubai International Airport is 29.9 km away, and Al Maktoum International Airport is 20.3 km away.
The surrounding built environment
Dubai Marina is a predominantly residential, high-density waterfront district with apartment towers along the marina and surrounding streets. The area includes established residential developments and hospitality venues beside the promenade. Completed towers in the district include 23 Marina, Cayan Tower and Azure. Other developments in Dubai Marina include The Residences at Marina Gate, Six Senses Residences Dubai Marina, Pelagos by IGO, Marina Living, Marina Cove, Mada’in Tower, LIV Residence and LIV Marina Tower. The waterfront public realm is largely linear, following the marina, with landscaped pockets beside selected residential blocks.
Harbour One Investment
Dubai Harbour Residences (Area 3) is developed by Harbour One Investment. The project began on 7 February 2025 and is recorded as active. Harbour One Investment is responsible for the 159-unit, single-building development in Dubai Marina. The registered project programme sets 14 January 2028 as the completion date, and construction progress stood at 20.04% at the inspection dated 17 April 2026.