by Wasl properties in Al Furjan
Hillside Residences 2 is a residential project by Wasl properties in Al Furjan, Dubai, with construction 12% complete per the DLD registry.
Construction progress
- Status date04.05.2026
- DLD project number2809
Data from the Dubai Land Department project registry (updated 07.08.2026 09:55).
About the project
Hillside Residences 2 is a five-building residential project by Jag Development in Al Furjan, within Dubai’s Jebel Ali First area. The development contains 280 units and has an Active status. Its recorded completion ratio was 11.95% at the inspection dated 4 May 2026.
Project configuration
Hillside Residences 2 is planned as a residential development comprising five buildings and 280 units. The project configuration is recorded as 1B+G+5/6/8/9 Residential, indicating a basement and ground-level arrangement with buildings rising to different recorded heights of five, six, eight and nine levels. The project began on 1 January 2024. Its recorded total area is 35,087.91. The structural description specifies a concrete structure and blockwork, with internal and external finishes included within the project design. The development is located in Al Furjan, a residential community in the Jebel Ali First sector of Dubai.
Construction progress
Hillside Residences 2 has an Active project status. The latest recorded inspection was carried out on 4 May 2026, when the completion ratio was listed at 11.95%. The project start date is recorded as 1 January 2024. Five buildings and 280 units form the registered project scope. The development is described as residential, with a concrete-and-block structure and internal and external finishes. These recorded details define the current project configuration and construction position for Hillside Residences 2.
Al Furjan setting
Al Furjan is a residential community in Jebel Ali First. Its original plan brought together houses and apartments around parks, walkways and green areas, while later development added apartment towers and serviced residences. The earliest phase of the community included 819 houses with gardens and terraces. Landscaping in the original master plan includes more than 30 parks and pedestrian connections. Al Furjan contains low-rise terraced housing, villa clusters and a growing number of apartment developments. Hillside Residences 2 sits within this established residential setting, where the housing mix combines the original villa and terraced-home areas with newer multi-unit residential projects.
Road and Metro connections
Al Furjan runs alongside D591 and has direct connections to E77, also known as Jebel Ali Road. These routes provide connections towards Sheikh Zayed Road. The community is served by the Dubai Metro Red Line extension, Route 2020, which connects with the wider Red Line network and the Expo alignment. Station R72 is 851 metres from the community centre and can be reached on foot. From Al Furjan, Dubai Marina is listed at 6.2 km, JBR Beach at 6.1 km, Palm Jumeirah at 9.7 km and Expo City Dubai at 7.2 km. Al Maktoum International Airport is listed at 14.4 km from the community.
Access to Dubai destinations
The road network around Al Furjan links D591 and E77 with routes towards Sheikh Zayed Road and other parts of Dubai. Mall of the Emirates is listed at 11.7 km from the community, while Global Village is listed at 17.0 km. Business Bay is listed at 21.5 km, Burj Khalifa and Downtown Dubai at 23.1 km, and The Dubai Mall at 23.4 km. Dubai International Financial Centre is listed at 24.9 km and Dubai International Airport at 33.6 km. Route 2020 provides a Metro connection from Al Furjan to the wider Red Line network, complementing the area’s road access.
Residential development in the area
Al Furjan includes 38 projects, with a further 68 projects in the immediate vicinity. The community’s original housing pattern focused on terraced homes and detached villa clusters, and subsequent development expanded the apartment and serviced-apartment supply. Other residential projects in Al Furjan include Vistara House 2, Sunbliss Residences, Sparklz by Danube, Roy Mediterranean Serviced Apartments, Rosalia Residences and Primero Residences. Amalia Residences by Deyaar and Azizi Central are also among the developments in the area. Hillside Residences 2 adds five residential buildings and 280 units to this wider Al Furjan project landscape.
Developer
Hillside Residences 2 is being developed by Jag Development. The project is registered with a scope of five buildings and 280 units, and construction began on 1 January 2024. Jag Development’s project is located in Al Furjan, within the Jebel Ali First area of Dubai. The residential scheme is designed with a concrete structure and blockwork, together with internal and external finishes. At the inspection dated 4 May 2026, Hillside Residences 2 was recorded as Active with an 11.95% completion ratio.