by Aura Infinite in Arjan
Aura Central is a residential project by Aura Infinite in Arjan, Dubai, with handover 14.07.2027, construction 98.6% complete per the DLD registry.
Construction progress
- Handover14.07.2027
- Status date31.07.2026
- DLD project number3327
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Aura Infinite · District: Arjan
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 11.05.2026 | 113.9 | 1 397 161 | |
| 15.04.2026 | 117.9 | 1 764 611 | |
| 26.03.2026 | 124.8 | 1 611 876 | |
| 26.03.2026 | 117.5 | 1 517 196 | |
| 26.03.2026 | 255.4 | 3 298 404 | |
| 04.02.2026 | 246.1 | 4 066 046 | |
| 16.12.2025 | 129.9 | 1 747 650 | |
| 20.11.2025 | 138.6 | 1 193 160 | |
| 06.11.2025 | 133.0 | 1 288 341 | |
| 06.11.2025 | 111.7 | 1 082 286 | |
| 20.10.2025 | 111.7 | 1 202 760 | |
| 20.10.2025 | 133.0 | 1 431 380 | |
| 16.09.2025 | 146.6 | 1 420 200 | |
| 16.09.2025 | 129.9 | 1 258 308 | |
| 16.09.2025 | 117.9 | 1 142 064 | |
| 14.07.2025 | 138.6 | 1 864 450 | |
| 14.07.2025 | 246.1 | 3 178 668 | |
| 03.07.2025 | 359.6 | 3 800 000 | |
| 03.07.2025 | 124.5 | 1 608 000 | |
| 25.06.2025 | 122.3 | 1 119 450 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Aura Central is a single commercial building with 38 units in Arjan, within Dubai’s Al Barsha South area. Aura Infinite Real Estate Development is developing the project. It is active, with a recorded completion ratio of 98.60% and a scheduled completion date of 14 July 2027.
The project and building format
Aura Central is planned as one commercial building comprising a basement, ground floor and four upper floors. The building contains 38 units, and the recorded total project area is 6,457.02. Its construction specification includes a concrete structure, blockwork, and internal and external finishes. The project commenced on 1 August 2024 and is designed as a mid-rise commercial property rather than a multi-building development. The basement, ground-floor and four-storey configuration places all 38 units within a single building. Aura Central is located in Arjan, a mixed-use district in the Al Barsha South area of Dubai.
Construction progress and completion
Aura Central is active and has a recorded construction completion ratio of 98.60%. The latest inspection date is 31 July 2026, and the project information was updated on 4 August 2026. The scheduled completion date is 14 July 2027. Its recorded start date is 1 August 2024. The development is registered as a one-building project with 38 units. Construction comprises a concrete structure and blockwork, followed by internal and external finishes. These details define Aura Central as a commercial project in the final stages of its recorded construction progress.
Arjan and the Al Barsha South setting
Aura Central is in Arjan, a mixed-use residential and leisure neighbourhood in Dubai’s Al Barsha South area. Arjan was launched in 2006 as part of the wider DubaiLand masterplan. The district includes apartment communities, retail plots and leisure attractions, with development zones intended for residential, retail, hotel and office components. Arjan sits north of Dubai Motor City, at the junction of Sheikh Mohammed Bin Zayed Road, E311, and Umm Suqeim Road, D63. The neighbourhood contains mid-rise residential buildings alongside planned retail plots and commercial components. Dubai Miracle Garden and Butterfly Park are both located in the area.
Road connections and city destinations
Arjan is connected to Sheikh Mohammed Bin Zayed Road, E311, and Umm Suqeim Road, D63. Dubai Marina is 10.3 km from the district, while Palm Jumeirah is 11.7 km away and JBR Beach is 11.0 km away. Mall of the Emirates is 7.6 km from Arjan, Global Village is 6.9 km away, and Expo City Dubai is 14.4 km away. Downtown Dubai and Burj Khalifa are 15.6 km away, while The Dubai Mall is 15.8 km away. Dubai International Airport is 24.9 km from Arjan, and Al Maktoum International Airport is 19.9 km away. The nearest listed Dubai Metro station is Red Line station R33, 7,818 metres from the community.
Leisure attractions, schools and local development
Dubai Miracle Garden opened in Arjan in 2013, followed by Butterfly Park in 2015. Global Village is 6.9 km from the community. Local retail and services are concentrated around Arjan’s residential clusters, and further retail development has been planned in the district. Dhruv Global School is listed at 0.2 km from the community, while Australian International School Dubai is listed at 0.6 km. Arjan also contains completed and ongoing mid-rise developments, including residential blocks and retail plots. The district’s wider masterplan accommodates residential, retail, hotel and office uses alongside its leisure attractions.
The developer
Aura Infinite Real Estate Development is the developer of Aura Central. The company is developing a single commercial building in Arjan with 38 units. Aura Central has a recorded project start date of 1 August 2024 and a scheduled completion date of 14 July 2027. The building is planned with a basement, ground floor and four upper floors. Its recorded construction progress is 98.60%, with an inspection dated 31 July 2026. The project’s construction specification includes concrete, blockwork, and internal and external finishes.
















